Rough River LakeAxtel Wastewater Treatment Plant Replacement
Closed Pre-Solicitation Posted
- Solicitation number
- W912QR26R-AXWWTP
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- Not on record
- Place of performance
- The work site is located within the Rough River Lake Project area at the Axtel Campground, along Highway 79, approximately 0.65 miles west of McDaniels, Breckinridge County, Kentucky 40119. 40119
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Louisville District, anticipates issuing an Invitation for Bids for a firm-fixed-price construction contract to execute the Rough River Lake Axtel Wastewater Treatment Plant Replacement, with a pre-solicitation notice response deadline of September 25, 2026. No set-aside applies.
Work is performed at Rough River Lake and comprises complete demolition and decommissioning of the existing wastewater treatment plant and construction of a new replacement subsurface sewage treatment and disposal facility. Demolition includes removal of the existing plant, chain-link perimeter fencing, and gravel surfacing. Construction scope includes precast concrete primary pretreatment septic tanks conforming to ASTM C1227 and 902 KAR 10:081/085; precast sewage lift stations, dose stations, and holding tanks; packaged Aerobic Treatment Unit or Advanced Wastewater Treatment System; soil drip dispersal field and piping network; gravity and pressure sewer piping with supply/return manifolds, flush valves, and air release/vacuum breaker valves; complete electrical service and distribution coordinated with Meade County RECC; NEMA 4X stainless steel control enclosures; UL 1449 Type 2 Surge Protective Devices; sequencing reactor controls; alarm systems; rough and finish grading; trenching; erosion and sediment control; replacement chain-link security fence with privacy slats; and site restoration. A contract line item for optional Rock Excavation will be unit-priced per cubic yard.
Notice text
Description of Proposed Work: The U.S. Army Corps of Engineers (USACE), Louisville District, anticipates issuing an Invitation for Bids (IFB) for a firm-fixed-price construction contract to execute the Rough River Lake Axtel Wastewater Treatment Plant Replacement. The overall scope of work comprises the complete demolition and decommissioning of the existing wastewater treatment plant and the construction of a new replacement subsurface sewage treatment and dispersal facility. Primary features of work include, but are not limited to:Demolition and Removal: Demolition and disposal of the existing Axtel Wastewater Treatment Plant, existing chain-link perimeter fencing, and gravel surfacing.Treatment and Disposal System Construction: Construction and installation of a new subsurface wastewater treatment and disposal system, including: Precast concrete primary pretreatment septic tanks conforming to ASTM C1227 and 902 KAR 10:081/085. Precast sewage lift stations, dose stations, and holding tanks. Packaged Aerobic Treatment Unit (ATU) / Advanced Wastewater Treatment System. Soil drip dispersal field and piping network.Piping and Distribution: Installation of gravity sewer piping and pressure piping networks, including supply/return manifolds, flush valves, and air release/vacuum breaker valves.Electrical and Control Systems: Complete electrical service and distribution, including coordination with Meade County RECC for service drop/upgrades, NEMA 4X (316 stainless steel) control enclosures, UL 1449 Type 2 Surge Protective Devices (TVSS), sequencing reactor controls, alarm systems, and associated conduits.Site and Civil Appurtenances: Rough and finish grading, trenching, erosion and sediment control measures, replacement chain-link perimeter security fence and gates with privacy slats, and site restoration.Optional Features: Contract Line Item Schedule includes an optional line item for Rock Excavation (unit-priced per cubic yard).
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside | |
| GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ | National Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity