Ross Dry Office Remodel for LBNF/DUNE-US Project
Closed Solicitation Posted
- Solicitation number
- RFP-LBNF-354352-REV01-JEE
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236 Construction of Buildings
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Lead, South Dakota, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory is seeking a subcontractor to provide design-build services for the remodeling of approximately 2,600 square feet of office space within the existing Ross Dry building at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The office space is required to support the Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) projects. Key requirements include providing stamped design drawings, performing demolition and construction activities such as electrical upgrades, HVAC installation, flooring, and interior finishes. Proposals are due by May 3, 2024.
This solicitation is not set aside for any specific business category. The applicable NAICS code is likely 236220 (Commercial and Institutional Building Construction), and the PSC code would be Y1GS (Construction of Buildings). No incumbent contractors are named. The budget or award value is not specified, but the subcontractor shall provide design-build services to complete the office buildout according to the agreed-upon schedule of values.
Notice text
The Long-Baseline Neutrino Facility (LBNF) Project will provide facilities to enable a world-class program in neutrino physics that can measure fundamental physical parameters, explore physics beyond the Standard Model and better elucidate the nature of matter and anti-matter. Specifically, LBNF will build a new high-intensity neutrino beam at the Fermi National Accelerator Laboratory (Fermilab), the “Near Site,” aimed at the Sanford Underground Research Facility (SURF), 1,300 km away at the “Far Site,” where a neutrino detector will be built; also known as DUNE (Deep Underground Neutrino Experiment). The experiment will be optimized for precision measurement of neutrino oscillations with the goal of searching for charge parity-violation in the neutrino sector, as well as making other precision oscillation measurements.
SURF is owned and operated by the South Dakota Science and Technology Authority (SDSTA).
The LBNF Project will require office space in the Ross Dry for Fermi Research Alliance (FRA) staff for the LBNF project as defined in the attached Request for Proposals (RFP). The proposed office space will be constructed via a design-build contract.
The office remodeling will require modifying approximately 2600 square-feet of area within the existing Ross Dry building. Provide necessary design drawings prepared and stamped by a South Dakota registered professional engineer to gain permits required for the scope of work within the existing Ross Dry building. Subcontractor to provide all necessary tools, equipment, and materials, labor and supervision to perform the office remodeling. The office remodeling will require modifying approximately 2600 square-feet of area within the existing Ross Dry building. Provide necessary design drawings prepared and stamped by a South Dakota registered professional engineer to gain permits required for the scope of work for FRA within the existing Ross Dry building. Supply the appropriately skilled personnel to perform the following types of listed activities:
- Stamped drawings as required by local codes - Demolition and removal of debris
- Electrical upgrades and circuit retrofitting - HVAC system installation and upgrades
- Self leveling floor prep. and application - Plumbing as needed
- Interior door and hardware installation - Carpet tile substrate prep. and installation
- Window retrofitting - Drywall installation and finishing
- Painting, staining, and finishing
- Data pathways provided, network infrastructure by others
Subcontractor shall provide design-build services including cost-saving alternatives. Alternate products proposed must be supported by recognized industry standard documents and/or data.
Subcontractor shall provide design-build services to provide the office buildout at the agreed-upon schedule of values presented in the Subcontract. Required subcontractors (second tier) to the design-build Subcontractor must be listed and approved by FRA as a part of the response to this Scope of Work. In addition to providing personnel, Subcontractor shall provide expendable equipment and material required to perform the office buildout activities.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| LBNF/DUNE-US South Dakota Scaffolding Services | Fermi National Accelerator Laboratory | No set-aside | |
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity