Road Treatment: Closure and Decommissioning (Demolition)

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1205G219R0002
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238910 Site Preparation Contractors
Place of performance
Wa Usa

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Road Treatment: Closure and Decommissioning (Demolition)

Multiple year, indefinite quantity, Multiple-Award Task Order Contract (MATOC) for road treatment on the Olympic National Forest, Washington.  The Forest Service intends to award three to five contracts.  Contract performance period is five years after date of award. 

Road treatment is to drain and stabilize the roadway to reduce the potential for environmental damage and to reduce long term maintenance needs. The work includes: project layout; removal of pipes and associated embankment fill; re-shaping the roadway for stabilization, surface drainage, erosion and sediment control measures; construction of road closure barriers; and work associated with project access. 

The Forest Service will proceed to issue a solicitation as a Request for Proposals (RFP) on, or about, MAR. 16, 2020.  This acquisition is 100 percent set-aside for small business concerns.  The Forest Service will award firm fixed-price contracts to the responsible Offerors whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the best value to the Forest Service.  Offers will be evaluated based upon: price; experience, past performance, managers & subcontractors, price realism, and a Level of Confidence Assessment Rating (LOCAR). 

In conjunction with the RFP the Forest Service will issue a Task Order for the Middle Dungeness Road Decommissioning/Storage project.  The task order proposal will be used to evaluate an offeror’s price reasonableness and price realism.   The government estimated value is between $100,000 and $250,000.  The project is on open and closed sections of Forest Service roads in the Dungeness watershed near Sequim, Washington.   Major items of work include final work layout and road maintain level (ML) reduction (closure or removal), including retaining a primitive trail described below.  Closure of roads may include constructing temporary road access to complete the project, road treatment, culvert and fill removals, restoring natural drainages and construction of cross ditches, fill slope pullback, and seed and mulch.  Planned outsloping areas will maintain a minimum trail (primitive trail) width of 3 feet.  A 3-foot wide access trail (primitive) will be left in place where fillslope pullback or fill material storage on the road bed occurs. Trees and slash will not be placed on the access trail (primitive trail). Road treatments will include scarification unless otherwise specified.  The proposed contract-type is firm-fixed price.

All responsible sources may submit an offer which will be considered by the government. Prospective contractor must be registered in the System for Award Management (SAM) database prior to award of a contract. Lack of registration in the SAM on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by contacting askSAM@gsa.gov, or via the Internet at http://www.sam.gov.

For additional information contact Mr. Miley Sutherland, Contracting Officer, at 360-956-2471, or email miley.sutherland@usda.gov , or Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov

Update #1 ·

Road Treatment: Closure and Decommissioning (Demolition)

Multiple year, indefinite quantity, Multiple-Award Task Order Contract (MATOC) for road treatment on the Olympic National Forest, Washington.  The Forest Service intends to award three to five contracts.  Contract performance period is five years after date of award. 

Road treatment is to drain and stabilize the roadway to reduce the potential for environmental damage and to reduce long term maintenance needs. The work includes: project layout; removal of pipes and associated embankment fill; re-shaping the roadway for stabilization, surface drainage, erosion and sediment control measures; construction of road closure barriers; and work associated with project access. 

The Forest Service will proceed to issue a solicitation as a Request for Proposals (RFP) on, or about, MAR. 12, 2020.  This acquisition is 100 percent set-aside for small business concerns.  The Forest Service will award firm fixed-price contracts to the responsible Offerors whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the best value to the Forest Service.  Offers will be evaluated based upon: price; experience, past performance, managers & subcontractors, price realism, and a Level of Confidence Assessment Rating (LOCAR). 

In conjunction with the RFP the Forest Service will issue a Task Order for the Middle Dungeness Road Decommissioning/Storage project.  The task order proposal will be used to evaluate an offeror’s price reasonableness and price realism.   The government estimated value is between $100,000 and $250,000.  The project is on open and closed sections of Forest Service roads in the Dungeness watershed near Sequim, Washington.   Major items of work include final work layout and road maintain level (ML) reduction (closure or removal), including retaining a primitive trail described below.  Closure of roads may include constructing temporary road access to complete the project, road treatment, culvert and fill removals, restoring natural drainages and construction of cross ditches, fill slope pullback, and seed and mulch.  Planned outsloping areas will maintain a minimum trail (primitive trail) width of 3 feet.  A 3-foot wide access trail (primitive) will be left in place where fillslope pullback or fill material storage on the road bed occurs. Trees and slash will not be placed on the access trail (primitive trail). Road treatments will include scarification unless otherwise specified.  The proposed contract-type is firm-fixed price.

All responsible sources may submit an offer which will be considered by the government. Prospective contractor must be registered in the System for Award Management (SAM) database prior to award of a contract. Lack of registration in the SAM on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by contacting askSAM@gsa.gov, or via the Internet at http://www.sam.gov.

For additional information contact Mr. Miley Sutherland, Contracting Officer, at 360-956-2471, or email miley.sutherland@usda.gov , or Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov

Files

Show all 13

Notice history

Notice Type Posted
Road Treatment: Closure and Decommissioning (Demolition) Award Award Notice
This notice Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors