Road maintenance including asphalt overlay and surface treatments
Award Notice Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W912DQ17B1014
- Agency
-
ENDIST Kansas City
US Army Corps of Engineers, Department of Defense
- Awarded
- to Higgins Asphalt Paving Co Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912DQ17C1094 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Harry S. Truman Dam and Reservoir U.S. Army Corps of Engineers 15968 Truman Road Warsaw, Missouri 65355, United States
Notice details come from SAM.gov. Updated .
Notice text
The following is a Pre-Solicitation Notice for this requirement. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). The U.S. Army Corps of Engineers, Kansas City District, intends to issue an Invitation for Bid (IFB)on or about JULY 31, 2017 on the FedBizOps website at www.fbo.gov. This requirement includes a construction project requiring roadway repair and pavement patching In accordance with FAR 36.204 and FARS 236.204, the estimated magnitude of this construction project is: Between $500,000 to $1,000,000. The NAICS code for this specialty is 237310 (Construction of Highways, Roads, Streets, Bridges, and Railways). The size standard
is $36.5 million. This requirement will be a 100% set-aside for small business.
This IFB will result in the award of a single Firm-Fixed-Price (FFP) construction contract. A Bid bond will be required with your bid in the amount of 20% of the bidder proposed price or $3,000,000.00 whichever is less. Payment and Performance bonds will be required for the full amount (100%) of the awarded contract before the
NTP can be issued. At this time, no pre-solicitation conference is planned for this solicitation. If the government does elect to hold a pre-solicitation conference, the pre-solicitation announcement will be modified accordingly. The estimated performance period for completion of construction is 120 calendar days from Notice to Proceed
(NTP).
This is a follow up posting, the original notice was siting the wrong solicitation number, see attached documents for original posting from 25 MAY 2017
Files
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation_Notice.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Solicitation for Road maintenance (asphalt overlay, asphalt patching, chip seal, and milling) | Solicitation | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity