RISC-V High Assurance FPGA Softcore Aberdeen Architecture

Closed Solicitation Posted

Solicitation number
A244-045
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

About this opportunity

The Department of the Army is soliciting Phase I SBIR proposals for topic A244-045, a RISC-V High Assurance FPGA Softcore Aberdeen Architecture, under a Total Small Business set-aside, with proposals due July 30, 2024 at 12:00 p.m. ET through the Defense SBIR/STTR Innovation Portal (DSIP). The topic is designated ITAR-controlled.

Phase I awards are available for up to $250,000 over up to six months of performance. Offerors must perform a minimum of two-thirds of Phase I research work in-house and maintain active SAM registration with accurate representations and certifications. Phase I requires feasibility work on a softcore Aberdeen Architecture implementation, including investigation of high assurance capabilities for information flow tracking and monitoring, and delivery of a close-out report describing the proposed FPGA softcore architecture and compiler. The government provides Phase I contractors a non-exclusive, royalty-free, government/commercial use license under U.S. patents [1]-[2] and pending patent [3] for 10 years to develop the softcore. The license is not transferable and ends if the company changes ownership, is sold, or merges with another company or companies. Offerors must disclose any proposed use of foreign nationals, their countries of origin, visa or work permit types, and the tasks foreign nationals would perform.

Required proposal volumes are a coversheet, a technical volume capped at 5 pages for Phase I, a cost volume with detailed substantiation, an eight-slide commercialization plan in the prescribed template, a company commercialization report for prior SBIR/STTR awardees, and a fraud, waste, and abuse training certificate. Proposals undergo responsiveness screening, technical evaluation by peer/scientific review, price reasonableness analysis, and responsibility determinations before award.

The NAICS code is 541715, Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology), and the PSC is AC12, National Defense R&D Services. No CMMC level requirement is projected for this topic, and no technical point of contact is designated.

Notice text

DoD SBIR topic A244-045

Component: ARMY

Command: AvMC (A)

Phase: SBIR Program Phase I Action

Technology Areas: Electronics; Information Systems; Sensors

Focus Areas: Advanced Computing and Software; Integrated Sensing and Cyber; Microelectronics; Trusted AI and Autonomy

Keywords: Softcore processor; RISC-V; high assurance; hardware trusted computing base

ITAR: Yes

Objective:

“RISC-V High Assurance FPGA Softcore Aberdeen Architecture,” research topic is to create a

softcore processor based on the concepts presented in [1]-[7] and RISC-V [8] instruction set

architecture.

Description:

The government shall provide phase I contractor(s) with a non-exclusive, royalty free, government/commercial use license for US patents [1]-[2], and pending patent [3] for 10 years to develop a FPGA softcore based Aberdeen Architecture. License is not transferable. License ends if the company changes ownership, is sold, merges with another company (ies), etc.

Tiwari [9] describes the current performance at all costs approach. “Almost every recent microarchitectural technique is built around the notion of optimizing the common case … if one is protecting a secret or handling untrusted data, every operation performed on that secret will affect those internal states in one way or another. Non-interference requires that those affected internal states are then in no way visible to the other components [all hardware and software]”.

All shared resources result in covert channels leaking information. Malicious actors can modulate shared resources to leak more information. No hardware resource can base decisions on information from more than one process at a time. As early as 1975, Saltzer and Lipner [10] pointed out that covert channels in Multics leak information. In 2005, Bernstein [11] showed how timing information leaks AES key bit information. In 2009, Acıiçmez, et al. [12] illustrated how a branch predictor (a shared hardware resource) can be manipulated or modulated to leak key bit information. In 2018, Spectre [13] and Meltdown [14] attacks maliciously manipulate hardware to leak information. To truly implement Saltzer and Schroeder’s security principles [15]-[17]; the security policy must be enforced from the hardware system architecture’s lowest level. Instruction execution must be at least one level above the security policy level, e.g. software cannot override, nor interact with any aspect of the security policy.

The OS Friendly Microprocessor Architecture or Redstone Architecture in [5] describes the cache bank, tag fields, and extended Harvard bus architecture for the Aberdeen Architecture. The Redstone Architecture provides for near real-time (a few clock cycles) context switching. The near zero context switch time offers another solution to information leakage prone conventional architectures.

In a traditional computer, an operating system manages computer system resources. Current microprocessors execute or run instructions without any verification or authentication. There is no difference between safe instructions, coding errors, and malicious instructions. Complete mediation [14] is a computer security principle meaning to verify access rights and authority for every operation. The Aberdeen Architecture can achieve near complete mediation for instruction execution [4]. The Aberdeen Architecture is also designed to block information leakage. It uses hardware-level state machine monitors for the trusted computing base. The state machine monitors provide security policies enforcing multiple information flow properties. The Aberdeen Architecture combines several protection methods to create a system security policy where the whole is greater than the individual security policies. The multiple security policies provide overlapping coverage, preventing brittleness and single-point security policy failures.

Phase I:

For the Phase I proposal, research team shall describe the feasibility of developing a softcore Aberdeen Architecture implementation. The offeror shall investigate the high assurance capabilities of information flow tracking and monitoring. SBIR awardees will be granted sufficient R&D IP rights to any active, government owned IP for the purposes of fulfilling the PHASE 1 and/or subsequent SBIR awards. For the phase I effort, the offeror shall demonstrate the feasibility and high assurance benefits of the Aberdeen Architecture over a conventional microprocessor. The offeror shall provide a close out report describing the proposed FPGA softcore architecture and compiler.

Phase II:

Research team shall develop an Aberdeen Architecture FPGA softcore implementation and software compiler. Research team shall deliver a year 1 report and a year 2 report describing Aberdeen Architecture and test results. Research team shall deliver a FPGA softcore and compiler computer architecture report. Offeror shall propose a demonstration project with government concurrence for the Phase II development effort. Offeror shall deliver to the government point of contact for test and evaluation: 2 prototype Aberdeen Architecture systems, compiler, all codes, software, etc. and licenses for all development tools to build and use the system. Research team shall provide 5 days of on-site training for the system.

Phase III:

Aberdeen Architecture offers potential benefits across several fields including banking, communications, telecom, medical electronics, aerospace, automotive electronics, and networking. Offeror shall consider and explore the potential use of the Aberdeen Architecture for both government and commercial applications. The government owns patents related to the Aberdeen Architecture. The government owned patents may be available for a commercial patent license agreement(s). Terms and conditions to be negotiated via a separate, patent license agreement with ARL at the appropriate time.

Files

File Type Posted
Army_244_R19.pdf PDF
A244-045.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Human Universal Remote NAICS 541715 Defense Advanced Research Projects Agency Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors