RFQ 19PE5026Q0011 - FAC - Replacement of CMR Security Barriers
Closed Solicitation Posted
- Solicitation number
- 19PE5026Q0011
- Agency
-
US Embassy Lima
US Consulates and Embassies, Department of State
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236118 Residential Remodelers
- Place of performance
- Peru
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of State Embassy Lima is soliciting construction services to replace three security barriers at the Chief of Mission Residence (CMR) in Lima, Peru. The Request for Quotations (RFQ 19PE5026Q0011) requires contractors to demolish the existing barriers, repair associated floors and pavement, and install three new manual drop arm barriers meeting PAS 68:2004 standards with a 4.5-meter aperture. Contractors must provide all equipment, tools, materials, and labor, with the Embassy supplying only water and electrical power. Award will be made to the lowest-priced, technically acceptable, responsible quoter based on evaluation of submitted proposals. Key deadlines include a pre-proposal site visit on March 5, 2026 at 11:00 a.m., a quotation submission deadline of March 17, 2026 at 11:00 a.m. local time, and a modification issued on March 12, 2026 that incorporates Appendix A into the Statement of Work.
This solicitation has no set-aside designation and identifies no current contractor or incumbent. The contract does not specify an award value or budget range. The contractor must commence work within 10 calendar days of award and complete all work within 60 calendar days, operating during normal business hours of 08:00 to 17:00 Monday through Friday. A mandatory performance bond equal to 30 percent of the contract price is required within 10 days of award, reducing to 10 percent upon final acceptance, along with Defense Base Act insurance and general liability insurance with a minimum of $30,000 per occurrence. Work will be performed at the Chief of Mission Residence located at Av. Arequipa Block 5, Santa Beatriz, Cercado Lima, Peru, with phased construction required to maintain at least one vehicle access point operational at all times during the project.
Notice text
The U.S. American Embassy has a requirement to obtain Construction Services to replace the three security barriers of the Chief of Mission Residence (CMR) in Lima, Peru.
Files
| File | Type | Posted |
|---|---|---|
| 26Q0011_Questions Answers.pdf | ||
| 26Q0009_SF30 - RFQ Modification.pdf | ||
| 26Q0011_RFQ Package.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Callao, Peru Infrastructure Modernization - U. S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA) | Department of the Army | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity