Restore Storm Drain Infrastructure-Northeast
Closed Pre-Solicitation Posted
- Solicitation number
- FA481926R8306
- Agency
-
Air Combat Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Tyndall AFB 32403
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Combat Command is seeking contractor services to repair and restore degraded stormwater infrastructure at Tyndall Air Force Base's main airfield. The project encompasses the repair of existing drainpipes and inlet structures at selected locations on base, with the primary objective of restoring proper drainage functionality and eliminating safety hazards, including sinkholes that have been identified by base maintenance personnel. This procurement falls under the Water and Sewer Line and Related Structures Construction category (NAICS 237110) and is classified as a repair or alteration project. The pre-solicitation notice was posted on February 6, 2026, with a deadline of February 19, 2026 for interested parties to respond or submit questions regarding the opportunity.
This contract opportunity is designated as a Total Small Business set-aside, limiting competition to small business entities as defined by the Small Business Administration. The estimated project value falls within the $5,000,000 to $10,000,000 range in accordance with FAR 36.204(g) requirements. No incumbent contractor information is provided in this pre-solicitation notice. Interested small businesses should note the February 19, 2026 deadline and prepare to respond with relevant qualifications and experience in stormwater infrastructure repair and restoration projects, as a formal solicitation is anticipated to follow this pre-solicitation phase.
Notice text
Purpose of this task order is to repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the Tyndall AFB main airfield. The existing stormwater infrastructure is in degraded condition and needs to be replaced to provide proper drainage and mitigate safety hazards associated with sinkholes noted by maintenance personnel on base. In accordance with FAR 36.204(g), the magnitude of this project is estimated to be between $5,000,000 and $10,000,000.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2NZ-- 658-23-108 Correct Stormwater Drainage | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| Repair Storm Damage Imperial Dam Road at YPG, AZ | ENDIST Los Angeles | No set-aside | |
| JBMHH Stormwater Management Facility Maintenance and Repair Services | MICC Fort Sam Houston | No set-aside | |
| Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP) | ENDIST Mobile | Total Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity