Request for Proposal for Elevator Upgrades at Richmond VAMC, Virginia.

Closed Solicitation Posted

This opportunity was awarded. See its 3 award notices in the notice history.

Solicitation number
36C24624R0048
Agency
Veterans Integrated Service Network 6 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238990 All Other Specialty Trade Contractors
PSC
Z1DA Maintenance Of Hospitals And Infirmaries
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is seeking proposals for the Elevator Upgrades Phase 2 project at the Central VA Health Care System (CVVHS) facility located in Richmond, Virginia. The project involves upgrading the elevators and associated equipment at the Richmond VAMC. Key requirements include providing all labor, materials, and supervision necessary to complete the work in compliance with applicable codes and regulations. Proposals will be evaluated based on technical capability, past performance, and price factors. Important dates include a site visit on April 10, 2024, a request for information deadline of April 15, 2024, and a proposal due date of May 13, 2024.

This procurement is not subject to a set-aside. The solicitation does not provide information on any incumbent contractors. The total estimated project value is between $1 million and $2 million. The work is to be performed at the Central VA Health Care System facility located at 1201 East Broad Rock Boulevard, Richmond, Virginia, 23249. The contract will have a period of performance of 180 days for the base proposal.

Notice text

4 versions

Update #4 · Latest ·

2

CONTINUATION PAGE

regard to the fire alarm system, if needed will the VA provide programming for new Shunt, Primary, Secondary, and Fire Hat modules? If not, can you please supply your 3rd party fire alarm contractor. Please refer to Attachment+A+-+COMBINED+SPECIFICATIONS.pdf page 57 of 82,

14 21 10 Modernization of Traction Elevators, 2.7.C

In regard to elevator controllers, is the VA requesting the same equipment as was installed in the previous modernization project or will other Non-proprietary equipment be accepted for consideration? The RVAMC is not requesting sole sourcing for P5, P6, and P7 modernization to match the equipment that exists for P1, P2, P3.

In lieu of geared machines will the VA accept proposals including gearless machines? Please refer to Attachment+A+-+COMBINED+SPECIFICATIONS.pdf page 44 of 82 and beyond, 14 21 10 Modernization of Traction Elevators for specification on traction hoist machine.

When will we have the opportunity to visit the site again to gain additional information in the elevator shafts, in the elevator machine room and access the roof?

Site visit was concluded on 4/10/2024 at 1:00PM EDT. No additional site visit is planned for this project. See attached pictures for elevator shaft. Elevator Machine room photos were previously provided in existing conditions pdf.

Where will we be able to store the elevator equipment to be installed? Contractor may store items in entrance to machine room, on rooftop (with appropriate protection from adverse weather) and in a 15ft x 25ft laydown area at the east end of the VA (see attached site map). Final location to be determined after award.

Will there be a dumpster provided to dispose of the existing equipment, if so, then where will it be located, if not, then can we provide one and where can it be located? Please review Attachment+A+-+COMBINED+SPECIFICATIONS.pdf page 5 of 82 1.8 Disposal and Retention. Also please see response to elevator equipment storage.

Please provide the company name and contact information for the companies that handle your HVAC, fire protection, fire suppression and electrical for the disconnects for the elevators. Please refer to Attachment+A+-+COMBINED+SPECIFICATIONS.pdf page 57 of 82,

14 21 10 Modernization of Traction Elevators, 2.7.C for Fire Alarm contractor.

Will we be able to use a crane to move the elevator equipment over the roof and through the machine room door on the roof? Yes

The base proposal states 180 days. The lead time for this equipment is well over 180 days and the installation is not achievable in 180 days during normal regular time business hours. Will the schedule be extended? Yes, the contract will be extended for verifiable material delays due to no fault of the contractor.

On page 8 of 73 under paragraph (b) Specific Instructions TAB B: Technical Capability lists Four Subfactors required.Â

Subfactor 1 - Management Approach

Subfactor 2 - Corporate Experience

Subfactor 3 - Key Personnel Qualifications

Subfactor 4 - Quality Control Plan

Then under the Evaluation Factors for Award - Technical Capability section starting on page 10 of 73 there are Six Subfactors listed.

Subfactor 1 - General Qualifications

Subfactor 2 - Corporate Experience

Subfactor 3 - Key Personnel Qualifications

Subfactor 4 - Contractor Responsibility Items

Subfactor 5 - Subcontractor List and Qualifications

Subfactor 6 - Project Management Plan

Please advise which section should be followed for the preparation of the Technical Proposals.

You should follow evaluation factors stated under Specific Instructions to prepare your pdf submittals tabs. Your Submittal must address the six subfactors which are factors used for ratings. In addition to Key Personnel Qualifications and Corporate Experience which were stated twice, all other factors must be addressed in your submission tabs.

Past Performance references

On page 9 of 72 paragraph (b) 2. Part II - Past Performance under subparagraph b. it states. "The references must return the survey directly to the Government Contracting Officer listed on the questionnaire, via email."

Solicitation attachment C - the Past Performance Questionnaire does not include any instructions or information on it to direct the references for how and to whom to return the forms to. Inform your references to submit directly to Contract Specialist, Moses Deng at moses.deng2@va.gov and cc Contracting Officer, Robert Ragos at Robert.ragos@va.gov

Additionally, under Evaluation Factors for Award on pages 13 & 14 - paragraphs 2.3 and 2.4 appear to suggest that CPARS can be used for the Past Performance evaluations if available and that the Past Performance Questionnaires would only be used for projects that do not have a CPARS available. Yes.

Please clarify the following:

CPARS can be submitted in lieu of the Past Performance Questionnaires. Yes.

If the Past Performance Questionnaires are required, please advise if previously completed Questionnaires can be utilized and submitted with our bid or if a new questionnaire must be filled out and submitted directly from the reference.

Previously completed Past Performance Questionnaires must be of recent to be acceptable. Recent past performance is defined as projects completed within the last ten years, with the actual completion date being not earlier than March 26, 2014. Questionnaire must be submitted directly from the reference to the contacts listed in answer to question #11

We would like to pose a few more questions related to JV agreements for this opportunity. Please see the two questions below.

Sub-Factor 1.1 requires the prime contractor to be a licensed general contractor. Please confirm that an SDVOSB joint venture bidding on this opportunity can rely on the capabilities and certifications by each individual venturer, as opposed to only considering the joint venture s qualifications, as required by 13 C.F.R. 128.402(f).

An SDVOSB joint venture registered with SBA can rely on the technical capability and qualifications of partners in the joint venture to satisfy Technical Capability.

Please confirm that an SDVOSB joint venture offeror may use the aggregated past performance and experience of its individual venturers to satisfy the corporate experience and past performance requirements, as required by 13 C.F.R. 128.402(f).

An SDVOSB joint venture registered with SBA can rely on the past performance and experience of partners in the joint venture to satisfy Technical Capability, Sub-Factor 2 Corporate Experience.

See below for additional information:

Sub-Factor 5 Subcontractor List and Qualifications (Excerpts from Solicitation)

CRITERIA and SUBMISSION REQUIREMENTS: Provide a list of subcontractors intended for use on the project, including the firm(s) (1.) entity name and address (2.) point of contact information (name, email and phone number), (3.) role as a joint-venture partner or subcontractor, (4.) planned role in the project, (5.) experience in the discipline(s) to be performed (including the number of years corporate experience in the discipline, (6.) the type/nature of the agreement (i.e. contract) that the prime contractor has with the subcontractor, and (7.) ability of the subcontractor to provide adequate resources to successfully complete the project. Information provided will be evaluated to ensure qualifications meet any minimum qualification requirements outlined in the Specifications, as well as to gauge the overall suitability of the subcontractor to the work being performed, and the business arrangement between the subcontractor and prime offeror. The offeror shall review the Specifications to determine all qualifications requirements.

Is this project tax exempt? No.

If they are in acceptable condition, is it possible to re-use the mechanical safeties as the sling is being re-used? No.

Please clarify if you would just like the entrances cleaned and polished or cladded with new stainless steel. Existing stainless-steel panels to remain, in the lobbies and within the cab, shall be cleaned, buffed, and polished.

Specifications are requiring bi-weekly maintenance for 12 months. Can this be monthly as bi-weekly seems excessive. No. Please refer to Attachment+A+-+COMBINED+SPECIFICATIONS.pdf page 80 of 82, 3.8.B

Do you require HEPA Filters? No. Contractor shall not expose patients, visitors, and staff to dust, odors.

What is required for electrical work? New disconnects? Pit Lights? Machine Room lights? New GFCI outlets? Sump Pump? Any fire alarm augmentations? Whatever is necessary to meet the requirements of Specification 14 26 26.

Are the elevators hooked up to a generator? Yes

Is there any work that needs to be done on off hours or weekends? Any work that would disrupt the normal hospital operations (Power outages, material moves that require closing off areas, etc.) and work that may pose safety risks to patients/staff/visitors (i.e. Crane operations).

Where and how many employees will be allowed to park their personal vehicles? Parking is limited and is on a first come, first served basis. Parking is permitted in the parking garage as well as in parking lots 8A thru 10B and 15A thru 15C. See attached site map.

Do you require a new self-closing, self-locking machine room door? No.

Can key personnel positions be dual hatted? Ex. Superintendent would also be SSHO, and Project Manager would be CQC. Yes.

Please identify any required permits. If permits are required, who is responsible for obtaining and paying for them? Contractor is responsible for obtaining and paying for any permits required to comply with Federal, State or Local regulatory/code requirements. Permits required by the VAMC (Hot Work, Lift Permit (if cranes will be utilized), Penetration (thru firewalls), Confined Spaces, etc.) may be obtained through our Safety Office located in 2K-133.

Will a certified engineer be required on site during construction? If so, will the engineer be required on site full time? If not, please provide requirements. Contractor is responsible for all inspections/certifications required to satisfy contract and code requirements.

If using a crane is not possible are there any restrictions on using a helicopter? Helicopters are prohibited.

If our proposed crane plan could not land the equipment at the elevator penthouse exterior door, can the craned material be transported across the roof? The roof is a reinforced concrete roof. It can support the transport of project materials. However, the contractor shall ensure transporting project material does not damage the roof and the existing equipment on the roof.

01 33 23, 1.3C Submittal Register - Can the VA please provide the initial submittal register as stated in the specifications to provide clarity on the extent of the submittals required for the project? The VA advises that the SOW and Specifications are reviewed to ensure the contractor is aware of what needs to be submitted for the project. 01 33 23 1.3.A should be reviewed as well.

01 33 23, 1.10D/E Review of Submittals The specifications reference 15 working days (3 weeks) for VA review of submittals/re-submittals and 10 working days (2 weeks) for VA review of RFIs. Can the VA please confirm these review periods are accurate? The up to date 01 33 23 is dated 11/2023. The review periods are accurate.

What software will be utilized on the project for submittal transfers? Will the Prime contractor be responsible for purchasing and maintaining this software? 01 33 23 1.6.E addresses submittal transfer software and who is responsible. It is the VA s preference to utilize Procore.

Will the VA require any construction management software to be utilized on the project? Will the Prime contractor be responsible for purchasing and maintaining this software? 01 33 23 1.6.E addresses submittal transfer software and who is responsible. It is the VA s preference to utilize Procore.

01 35 26, 1.7 SSHO The specifications call for a full time SSHO to maintain a presence onsite. Can the VA please confirm that the awarded prime contractor must fulfill this requirement? Must the SSHO be employed by the Prime contractor? Can the SSHO perform any physical work onsite, or will they strictly be required to supervise work? 01 35 26 1.7.D established the requirement of when the SSHO or Equally qualified designated representative/alternate needs to be onsite. 01 35 26 1.7.D refers to FAR 52.236-6 addressing who employs the SSHO. The SSHO shall perform their duties as specified in 01 35 26.

01 35 26, 1.12 Infection Control Can the VA please provide more details on the extent of the infection control wall requirements for the project? Can the prime contractor utilize Starc Wall systems or something similar? Please refer to 01 35 26 1.12.B for scope area classification. 01 35 26 1.12.B.2 provides information on the classification requirements. Contractor shall not expose patients, visitor, and staff to dust, odors, or any other particulate dispersed due to construction.

Please identify the ASME 17.1 and IBC code years applicable to this solicitation. The latest code year is applicable to this solicitation.

Do the elevators currently operate on emergency power? The penthouse power distribution panel is fed from an ATS.

Do the elevators currently receive a pre-transfer signal from the ATS (Automatic Transfer Switch)? The new controllers will require a pre-transfer signal from the ATS. Yes.

If no pre-transfer signal currently exists, does the ATS have the capability to time delay and send a pretransfer signal to the elevators it serves? Additionally, where is the ATS located within the building for each elevator identified in the solicitation? Conductors will need to be run in conduit and programmed to function. Contractor needs to know length of run, quantity or runs, and potential routing. Pre-transfer signal already exists for the elevators being modernized.

Are there specific manufacturers the VA is interested in? Are the prime contractors to include elevator equipment in their bids that meet the buy American act, are nonproprietary, and are universally maintainable? The VA is not requiring any specific manufacturers for the elevator equipment. It is preferred by the VA to match the already modernized Equipment. Please review 36C24624R0048_1 Section 2.6 for Buy American Requirements.

-------------------------------------------------------------------END-------------------------------------------------------

Update #3 ·

2.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for - Wednesday April 10, 2024, at 1:00PM EDT.

(c) Participants will meet at Bldg. 500, Central Virginia VA Health Care System, 1201 Broad Rock Blvd. Richmond, VA 23249.

(End of Provision)

Update #2 ·

2.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for - Friday April 5, 2024 at 10:00AM EDT.

(c) Participants will meet at Bldg. 500, Central Virginia VA Health Care System, 1201 Broad Rock Blvd. Richmond, VA 23249.

(End of Provision)

Update #1 ·

Request for Proposal for Elevator Upgrades Phase 2 located at: Central VA Health Care System (CVVHS), 1201 East Broad Rock Boulevard, Richmond, Virginia, 23249.

Attachments

Files attached to this notice, newest first
File Type Posted
IMG_1281.jpg JPG image
IMG_1276.jpg JPG image
IMG_0058.jpeg JPEG file
IMG_0059.jpeg JPEG file
36C24624R0048 0003.docx DOCX document
IMG_1283.jpg JPG image
IMG_1282.jpg JPG image
IMG_1280.jpg JPG image
IMG_1277.jpg JPG image
IMG_1274.jpg JPG image
S04 Site Visit-Elevator Upgrades.pdf PDF
IMG_1279.jpg JPG image
IMG_1278.jpg JPG image
IMG_1275.jpg JPG image
IMG_0056.jpeg JPEG file
Site Map.pdf PDF
36C24624R0048 0002.docx DOCX document
36C24624R0048 0001.docx DOCX document
Attachment B - EXISTING CONDITIONS PICTURES.pdf PDF
36C24624R0048_1.docx DOCX document
Attachment C - PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment E - ITEMIZED SCHEDULE OF VALUES COST BREAKDOWN.xlsx XLSX spreadsheet
Attachment D - WAGE DETERMINATION.pdf PDF
Attachment A - COMBINED SPECIFICATIONS.pdf PDF
Show all 24

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z1DA--652-23-110 Elevator Upgrades Phase 2 Latest Award Notice
Z1DA--652-23-110 Elevator Upgrades Phase 2 Award Notice
Z1DA--652-23-110 Elevator Upgrades Phase 2 Award Notice
Request for Proposal for Elevator Upgrades at Richmond VAMC, Virginia. This notice · Latest solicitation Solicitation
Request for Proposal for Elevator Upgrades at Richmond VAMC, Virginia. Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity