Request for Offerors (RFO) for Delivery of firm load following electric supply service at the William J. Hughes Technical Center (WJHTC) Atlantic City International Airport, NJ
Closed Solicitation Posted
- Solicitation number
- 697DCK-26-R-00210
- Agency
-
Federal Aviation Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 221122 Electric Power Distribution
- PSC
- S112 Utilities- Electric
- Place of performance
- Atlantic City, New Jersey 08401, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration Real Estate Office is soliciting competitive offers for the delivery of firm load-following electric supply services to the William J. Hughes Technical Center located at Atlantic City International Airport in New Jersey. The procurement encompasses electric energy, ancillary services, ARR credits, PJM marginal losses, New Jersey Renewable Portfolio Standards compliance, transmission enhancement charges, FERC Order 745 charges, balancing congestion charges, Reliability Must Run charges, and capacity and transmission services. Prospective offerors must hold an active Electric Power Supplier License issued by the New Jersey Board of Public Utilities and meet all technical submission requirements outlined in Section L.1 of the solicitation. The FAA will award to the lowest-priced, technically acceptable offeror based on either Real-Time Index pricing or Day-Ahead Index pricing, whichever option presents the lowest overall cost. Proposals are due by 1:00 PM Eastern Time on April 29, 2026, with submission directed to Tito.Stokes@faa.gov.
This is an unrestricted, full and open competition procurement with no set-aside designations, using the FAA Acquisition Management System. The contract term runs for 12 months, commencing June 1, 2026, and concluding May 31, 2027, with service delivery at the AECO Zone delivery point. Offerors must submit price proposals on FAA-supplied forms, two sample invoices calculated using provided hourly load data and locational marginal pricing data, a sample attestation demonstrating compliance with New Jersey Renewable Portfolio Standards, and completed representations and certifications. The facility's anticipated consumption data indicates peak load contributions of 8,948.79 kW for capacity and 9,732.36 kW for transmission, with baseline annual consumption of approximately 65 million kWh. The place of performance is Atlantic City, New Jersey 08401, and all FAA contract clauses must be accepted without exception, with contract prices to be made publicly available for the full contract period.
Notice text
2 versions
Update #2 · Latest ·
Note: The posting has been updated to ensure that Attachment 1 and Attachment 2 are named correctly to correspond with their respective documents.
The Federal Aviation Administration Real Estate Office currently has a requirement fors for the delivery of firm load following electric supply services, including electric energy, ancillary services, ARR credits, PJM marginal losses, NJ Renewable Portfolio Standards, Transmission Enhancement Charge,FERC Order 745 charges, balancing congestion charges, RMR charges, and capacity and transmission services to the William J. Hughes Technical Center (WJHTC) located at the Atlantic City International Airport, Atlantic City, NJ 08401
All required RFO documents are attached
Update #1 ·
The Federal Aviation Administration Real Estate Office currently has a requirement fors for the delivery of firm load following electric supply services, including electric energy, ancillary services, ARR credits, PJM marginal losses, NJ Renewable Portfolio Standards, Transmission Enhancement Charge,FERC Order 745 charges, balancing congestion charges, RMR charges, and capacity and transmission services to the William J. Hughes Technical Center (WJHTC) located at the Atlantic City International Airport, Atlantic City, NJ 08401
All required RFO documents are attached
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Electricity 2027 | Reserve Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity