About this opportunity

The Department of the Air Force Materiel Command Lifecycle Management Center is issuing a Request for Information to conduct market research for design, development, and production of a replacement Advanced Wing Weapons Pylon (AWWP) for B-52 aircraft, with RFI responses due July 6, 2026. No set-aside applies.

The Government seeks industry partners capable of supporting an accelerated 36-month Engineering and Manufacturing Development phase culminating in a Critical Design Review, followed immediately by production of 20 to 24 pylons with a minimum delivery of 12 in the first year. The AWWP must incorporate MIL-STD-1760 series heavy weapon capability. Respondents must demonstrate engineering expertise in designing and manufacturing heavy weapons carriage systems rated above 5,000 pounds capacity and assess feasibility of the compressed EMD and production timeline.

The Air Force explicitly encourages small business participation. Physical work locations may vary, and interested parties must be willing and able to travel. The RFI is intended to inform the Government's overall acquisition strategy and identify qualified vendors before formal solicitation.

NAICS: 336413 (Other Aircraft Parts and Auxiliary Equipment Manufacturing); PSC: 1560 (Airframe Structural Components).

Notice text

The Department of the Air Force is issuing this Request for Information (RFI) to conduct market research and identify qualified industry partners capable of supporting an accelerated Engineering and Manufacturing Development (EMD) phase and subsequent production of a replacement external weapons release pylon for the B-52 aircraft.

To meet emerging mission needs, the Government requires a newly designed Advanced Wing Weapons Pylon (AWWP) that incorporates MIL-STD-1760 series heavy weapon capability.

The anticipated acquisition strategy targets a 36-month EMD phase culminating in a Critical Design Review (CDR). Upon successful completion of the EMD phase, the design must be ready for integration with required support equipment, transitioning immediately into the production of 20 to 24 pylons (with a minimum delivery of 12 pylons in the first year).

Key Objectives for Industry Feedback:

  • Assess the feasibility of the proposed 36-month EMD timeline to CDR and production timeline.

  • Identify vendors with the engineering expertise to design and manufacture heavy weapons carriage systems (>5,000 lbs capacity).

  • Inform the Government's overall Acquisition Strategy.

Note: Physical work locations may vary, and interested parties must be willing and able to travel. Small businesses are highly encouraged to participate and respond to this RFI.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Aflrw RFI 2 Eglin AFB, Florida, United States · NAICS 336414 AFLCMC Eglin AFB No set-aside
Aircraft, stratofortress, B-52; panel, structural, AI Richmond, Virginia 23237, United States · NAICS 336413 Aviation Total Small Business
Request for Information - Extended Range Attack Munition Eglin AFB, Florida, United States · NAICS 336414 Air Force No set-aside
Request for Information: Extended Range Attack Munition Glide Eglin AFB, Florida, United States · NAICS 332993 Air Force No set-aside
04F | flap, wing landing | B-52 Richmond, Virginia 23297, United States Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors