Replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS
Closed Solicitation Posted
- Solicitation number
- W9124721T0800
- Agency
-
Mission and Installation Contracting Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 334419 Other Electronic Component Manufacturing
- Place of performance
- Fort Bragg, North Carolina 28310, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Please see updated information word document
Update #2 ·
Government Requirements Document
-
- Overview
The like for like replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS located in Bldg 1-1434 on Fort Bragg, NC. Services to include: Delivery, unloading and site staging of new batteries, proper removal and EPA disposal of existing batteries, onsite Liebert technician to operate UPS transfer.
Initial installed site ID: 147074 (installed 02/2014)
Tag #s: 1679528, 1679529, 1679530
-
- Services to be performed:
A Liebert certified technician shall perform the following services.
Contractor shall:
- Verify the integrity of the battery rack/cabinet.
- Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online.
- Replace with new batteries in the exact same orientation as the old units.
- Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries.
- Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries.
- Apply anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer.
- Ensure all battery monitoring wires are connected properly, if battery monitoring is present.
- Replace system capacitors with like parts.
- Verify that no ground faults exist prior to energizing the system.
- Return the battery system to normal float per the manufacturer’s guidelines.
- Measure and record the total battery float voltage (at the battery).
- Measure and record charging current.
- Measure and record the overall AC ripple voltage.
- Measure and record the overall AC ripple current.
- Measure and record the ambient temperature.
- Measure and record 100% of the jar temperatures.
- Measure and record the float voltage of all jars.
- Commission the Alber monitor (if present) following the standard commissioning procedures.
- Provide the battery the proper Freshening charge per the manufacturer’s guidelines.
- Clean the site of any foreign materials left behind.
- Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)
Equipment specifications
-
- VRLA Batteries – compatible with model 38BP120XRX1BNS
- Capacitors - compatible with model 38BP120XRX1BNS
-
- Like for like replacement is acceptable as long as they are 100% compatible with the model specified.
3 Deliverables
Activities related to scheduled tasks will support the deliverables necessary for a successful project.
▪ Project Initiation/Project Kick-Off
▪ Test results and Battery readings
▪ Method of Procedure
▪ As-Built Documentation
Update:
Make, Model: Liebert, Model # 38BP120XRX1BNS, three 120kva units.
Battery info: 120 - HX330 or equivalent
1
Government Requirements Document
-
- Overview
The like for like replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS located in Bldg 1-1434 on Fort Bragg, NC. Services to include: Delivery, unloading and site staging of new batteries, proper removal and EPA disposal of existing batteries, onsite Liebert technician to operate UPS transfer.
Initial installed site ID: 147074 (installed 02/2014)
Tag #s: 1679528, 1679529, 1679530
-
- Services to be performed:
A Liebert certified technician shall perform the following services.
Contractor shall:
- Verify the integrity of the battery rack/cabinet.
- Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online.
- Replace with new batteries in the exact same orientation as the old units.
- Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries.
- Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries.
- Apply anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer.
- Ensure all battery monitoring wires are connected properly, if battery monitoring is present.
- Replace system capacitors with like parts.
- Verify that no ground faults exist prior to energizing the system.
- Return the battery system to normal float per the manufacturer’s guidelines.
- Measure and record the total battery float voltage (at the battery).
- Measure and record charging current.
- Measure and record the overall AC ripple voltage.
- Measure and record the overall AC ripple current.
- Measure and record the ambient temperature.
- Measure and record 100% of the jar temperatures.
- Measure and record the float voltage of all jars.
- Commission the Alber monitor (if present) following the standard commissioning procedures.
- Provide the battery the proper Freshening charge per the manufacturer’s guidelines.
- Clean the site of any foreign materials left behind.
- Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)
Equipment specifications
-
- VRLA Batteries – compatible with model 38BP120XRX1BNS
- Capacitors - compatible with model 38BP120XRX1BNS
-
- Like for like replacement is acceptable as long as they are 100% compatible with the model specified.
3 Deliverables
Activities related to scheduled tasks will support the deliverables necessary for a successful project.
▪ Project Initiation/Project Kick-Off
▪ Test results and Battery readings
▪ Method of Procedure
▪ As-Built Documentation
Update #1 ·
Government Requirements Document
-
- Overview
The like for like replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS located in Bldg 1-1434 on Fort Bragg, NC. Services to include: Delivery, unloading and site staging of new batteries, proper removal and EPA disposal of existing batteries, onsite Liebert technician to operate UPS transfer.
Initial installed site ID: 147074 (installed 02/2014)
Tag #s: 1679528, 1679529, 1679530
-
- Services to be performed:
A Liebert certified technician shall perform the following services.
Contractor shall:
- Verify the integrity of the battery rack/cabinet.
- Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online.
- Replace with new batteries in the exact same orientation as the old units.
- Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries.
- Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries.
- Apply anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer.
- Ensure all battery monitoring wires are connected properly, if battery monitoring is present.
- Replace system capacitors with like parts.
- Verify that no ground faults exist prior to energizing the system.
- Return the battery system to normal float per the manufacturer’s guidelines.
- Measure and record the total battery float voltage (at the battery).
- Measure and record charging current.
- Measure and record the overall AC ripple voltage.
- Measure and record the overall AC ripple current.
- Measure and record the ambient temperature.
- Measure and record 100% of the jar temperatures.
- Measure and record the float voltage of all jars.
- Commission the Alber monitor (if present) following the standard commissioning procedures.
- Provide the battery the proper Freshening charge per the manufacturer’s guidelines.
- Clean the site of any foreign materials left behind.
- Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)
Equipment specifications
-
- VRLA Batteries – compatible with model 38BP120XRX1BNS
- Capacitors - compatible with model 38BP120XRX1BNS
-
- Like for like replacement is acceptable as long as they are 100% compatible with the model specified.
3 Deliverables
Activities related to scheduled tasks will support the deliverables necessary for a successful project.
▪ Project Initiation/Project Kick-Off
▪ Test results and Battery readings
▪ Method of Procedure
▪ As-Built Documentation
1
Government Requirements Document
-
- Overview
The like for like replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS located in Bldg 1-1434 on Fort Bragg, NC. Services to include: Delivery, unloading and site staging of new batteries, proper removal and EPA disposal of existing batteries, onsite Liebert technician to operate UPS transfer.
Initial installed site ID: 147074 (installed 02/2014)
Tag #s: 1679528, 1679529, 1679530
-
- Services to be performed:
A Liebert certified technician shall perform the following services.
Contractor shall:
- Verify the integrity of the battery rack/cabinet.
- Measure and record all open circuit voltages for all units to ensure they can be placed in the string(s) and online.
- Replace with new batteries in the exact same orientation as the old units.
- Replace hardware if supplied with the new batteries. If not supplied, inspect, clean and neutralize the existing cables and clean the racks/trays from any possible leaking batteries.
- Clean any corrosion from cables if re-using existing cables and clean the racks/trays from any possible leaking batteries.
- Apply anti-corrosion inhibitor to the face of the connector and to the contact surface of the battery terminal or as directed by the battery manufacturer.
- Ensure all battery monitoring wires are connected properly, if battery monitoring is present.
- Replace system capacitors with like parts.
- Verify that no ground faults exist prior to energizing the system.
- Return the battery system to normal float per the manufacturer’s guidelines.
- Measure and record the total battery float voltage (at the battery).
- Measure and record charging current.
- Measure and record the overall AC ripple voltage.
- Measure and record the overall AC ripple current.
- Measure and record the ambient temperature.
- Measure and record 100% of the jar temperatures.
- Measure and record the float voltage of all jars.
- Commission the Alber monitor (if present) following the standard commissioning procedures.
- Provide the battery the proper Freshening charge per the manufacturer’s guidelines.
- Clean the site of any foreign materials left behind.
- Prepare batteries for recycling and transportation (wrap the batteries with plastic wrap to secure them to the pallets)
Equipment specifications
-
- VRLA Batteries – compatible with model 38BP120XRX1BNS
- Capacitors - compatible with model 38BP120XRX1BNS
-
- Like for like replacement is acceptable as long as they are 100% compatible with the model specified.
3 Deliverables
Activities related to scheduled tasks will support the deliverables necessary for a successful project.
▪ Project Initiation/Project Kick-Off
▪ Test results and Battery readings
▪ Method of Procedure
▪ As-Built Documentation
Files
| File | Type | Posted |
|---|---|---|
| UPDATED INFORMATION.docx | DOCX document | |
| GRD Bldg 1-1434 UPS Battery replacement.docx | DOCX document |