This solicitation seeks a firm fixed-price construction contract to replace Taxiway Whiskey Phase IV at Joint Base Andrews in Maryland. The Department of the Army Corps of Engineers Baltimore District will award a contract to repair and replace existing taxiway pavements, shoulders, drainage, signage, lighting systems, duct banks, paint and markings; re-align taxiways; and construct temporary facilities. Offerors must detail plans to handle concrete mix design approvals, as they will prepare at least two mix designs using different fly ash sources. Proposals are due by July 14, 2021 and will be evaluated based on technical qualifications, past performance, and price. The period of performance is 450 calendar days from notice to proceed.

There is no set-aside designated for this procurement. The primary NAICS code is 237990 and PSC code is F999. The place of performance is Joint Base Andrews, MD, where the $10-15M project will replace approximately 5,000 linear feet of deteriorated taxiway over 450 calendar days without interrupting airfield operations. The incumbent contractor is anticipated to be the offeror currently performing the adjacent Phase III construction.

Notice text

The project consists of construction of the Fourth Phase of a four phased project replacing an existing deteriorated taxiway without interrupting the airfield mission. This Phase will be aligned with Phase III “as built” conditions. The work includes the repair/replacement of existing taxiways pavements, shoulders, drainage, signage, lighting systems, duct banks, paint and markings, re-align taxiways, and temporary taxiways. The project scope also includes excavation, site preparation, striping, restoration of disturbed areas, storm water management features and mitigation measures, construction management services, airfield self-escorting plus all necessary and essential utilities and work to satisfy operation requirements associated with this project to include demolition. The contractor will be required to prepare at least two or maybe more “mix designs” to identify different sources of “fly ash” to ensure sufficient quantities to complete the project.  The RFP for the construction contract will request the proposals to detail their plan to handle the approval requirements of the concrete mix design. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Airfield pavements will be designed in accordance with UFC 3-260-01, Airport and Heliport Design, UFC 3-260-02, Pavement Design, and UFC 3-535-01, Visual Air Navigation Facilities.

Files

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors