Replace Long Distance Heating Lines at Range # 118, Grafenwoehr Training Area

Award Notice Posted

Solicitation number
W912PB15T8037
Agency
Awarded
to Einhäupl Gesellschaft MIT Beschränkter Haftung
Set-aside
No set-aside

Opportunity facts

Contract number
W912PB15P8036 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This project specifies the following work:

Range # 118 is located south of the East Camp Grafenwoehr, approx. 2 km north of gate # 4 and can be reached via tank road.

The existing long distance heating line leading to buildings # 11802, 11803 and 11804 at Range # 118 will be replaced. The long distance heating line between buildings # 11801 and 11837 will be dismantled up to building # 11803 and then connected to the new double pipeline.

Both heating lines in building # 11801 will be dismantled up to the heating manifold and a new heating line will be installed up to the house connection of the long distance heating.

The cable for the EMCS will be placed within the same trench.

The existing fittings installed within the buildings # 11802, # 11803 and # 11804 will be removed and new closed substations will be installed.

The self-supporting masonry chimney will be dismantled and replaced by a new stainless steel exhaust gas system which is adapted to the heat generators.

Update #1 ·

This project specifies the following work:

Range # 118 is located south of the East Camp Grafenwoehr, approx. 2 km north of
gate # 4 and can be reached via tank road.

The existing long distance heating line leading to buildings # 11802, 11803 and
11804 at Range # 118 will be replaced. The long distance heating line between buildings # 11801 and 11837 will be dismantled up to building # 11803 and then connected to the new double pipeline.

Both heating lines in building # 11801 will be dismantled up to the heating
manifold and a new heating line will be installed up to the house connection of the long distance heating.

The cable for the EMCS will be placed within the same trench.

The existing fittings installed within the buildings # 11802, # 11803 and # 11804 will be removed and new closed substations will be installed.

The self-supporting masonry chimney will be dismantled and replaced by a new
stainless steel exhaust gas system which is adapted to the heat generators.