Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Award Notice Posted

Solicitation number
W90VN6-17-R-0048
Agency
Awarded
to Dukdong Industry CO. , LTD.
Set-aside
No set-aside

Opportunity facts

Contract number
W91QVN-14-D-0037-0081 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Osan AB Pyongtaek, Korea, South

Notice details come from SAM.gov. Updated .

Notice text

STATEMENT OF WORK
W/O 86244
REPLACE FLOORING, B-819, 824
OSAN AB, ROK



1. DESCRIPTION: The work to be performed for completion of this project shall be as described in general below.


1.1. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.


1.2. All work shall be completed IAW drawings and specifications.


1.3. All work shall be completed within 90 calendar days after N.T.P.


 


2. PRINCIPLE FEATURES: This project includes the following principle features:


2.1. Architecture Works


Contractor's performance shall be strictly in compliance with the terms and conditions in the contract and the applicable documents attached hereto. Specific tasks are as follows.


2.1.1. Replace carpet with new (9T, level loop type, Hyosung, Kolon or equal) in 4 EA rooms of Bldg#819 not including cove base. Cushion shall be compatible with selected carpet. See floor plan for Bldg#819, yellow highlighted area (Reference Spec. 09 68 00).


2.1.2. Remove existing flooring and install new vinyl composition tile (3.0t, 12"x12", Hanhwa Deluxe, LG PVC, KCC Deluxe or equal) including cove base in RM#104, #107, #113, #106, #102 and #101 of Bldg#824. See floor plan for Bldg#824 yellow highlighted area (Reference Spec. 09 65 00).


2.1.3. Provide 3 EA entrance mat (72"x504", 71"x290", 65"x240") and backing with rubber (Non slip, 100% polypropylene BCF, Saxony cut, gray color swan mat 200 or equal).


2.1.4. Contractor shall move office furniture and desk during his work, however end user shall be responsible for disconnect and connect computers.

Files

File Type Posted
Floor_Plan.pdf PDF
SF1442.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors