Repairs to the North Jetty, Hampton Harbor, Hampton, NH
Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W912WJ23B0008
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for repairs to the North Jetty at Hampton Harbor in Hampton, New Hampshire. The repairs are estimated to cost between $5-10 million and involve reconstructing approximately 465 linear feet of the jetty, widening its crest, and increasing the armor stone thickness. The solicitation and contract documents will be available on or about late-March 2023 via the Procurement Integrated Enterprise Environment. Questions regarding this pre-solicitation notice can be directed to the named Contract Specialist.
There is no set-aside designation for this procurement. The NAICS code is 237990 for heavy construction with a size standard of $37 million. Repairs are to be completed by March 1, 2024 and will require approximately 8,000 tons of new armor stone between 6-10 tons each as well as 2,000 tons of underlayer stone. Marine-based work can begin on July 1, 2023 while land-based work starts September 15, 2023.
Notice text
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Hampton North Jetty Repairs at the Hampton Harbor Federal Navigation Project, located in Hampton, New Hampshire. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about 4 months to complete. The estimated construction cost is $5,000,000 to $10,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.
This project will require both land-based and floating marine plant construction methods in order to address damages sustained during a vessel strike in 2016 and consecutive Nor’Easters which occurred in March 2018. The north jetty repair work involves reconstruction of sections of the jetty, as well as widening of the jetty crest to create a more robust structure. Repairs will involve roughly 465 linear feet of the jetty. In order to perform durable repairs, the jetty will be dismantled to just below the Mean Lower Low Water (MLLW) water line and reconstructed with underlayer stone and armor stone of an increased size. On the ocean side of the jetty, repairs will occur below MLLW to existing grade and include construction of a new jetty toe. The armor stone thickness will be increased from one armor stone layer to a minimum of two armor stones at all locations within the repair area for an armor stone depth of approximately 9 feet. Existing 6-10 ton armor stone in the repair area in good condition will be reused in the jetty structure, and existing 3-4 ton armor stone will be used to construct the new toe. Any stone removed and not reincorporated into the structure, to include a combination of existing core/underlayer stone and undersized armor stone, will be placed along the jetty toe on either the ocean-side or channel-side of the jetty.
Approximately 8,000 tons of new armor stones, ranging from 6 to 10 tons each will be incorporated into the jetty as well as existing stones will be repurposed into the design. Approximately 2,000 tons of new underlayer stone will also be required. The Government anticipates the majority of the work will be completed by water due to limited beach access and location of repair area in tide range. The work on this project is anticipated to be primarily from the oceanside of the structure and includes dismantling, removing, stockpiling, reworking and reinstalling existing armor stone; and the testing, acquiring and installation of new underlayer stone and armor stones in the repair area. The jetty repair area is located directly offshore, adjacent to the navigation channel.
Repair operations can start on July 1, 2023, for marine based while land-based can begin September 15th. All work must be complete by March 1, 2024. Due to events at the State Park, land-based staging/storage/access area is available starting on 25 September 2023.
This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about late-March 2023. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the Procurement Integrated Enterprise Environment (PIEE) (https://piee.eb.mil/), Solicitation module. All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Heather.Skorik@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repairs to the North Jetty, Hampton Harbor, Hampton, NH | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia | ENDIST Norfolk | No set-aside |