Repairs to the Federal Navigation Project Breakwater at Hyannis Harbor, Barnstable, MA.

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912WJ21B0014
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Hyannis, Massachusetts 02601, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the U.S. Army Corps of Engineers, New England District seeks offers to restore full functionality and enhance durability of the outer breakwater at Hyannis Harbor in Barnstable, Massachusetts. The work includes adaptively reconstructing the last 400 feet of the structure using new 5 to 7 ton stones and repurposing existing parapet stones to form a rubble mound configuration tying into repairs made in the 1960s. It also requires repairing the remaining approximately 800 feet of the breakwater to its existing dimensions by adding similarly sized stones and replacing any displaced. Due to the marine location, all work must be performed totally from marine-based plant, with no staging or storage of materials allowed adjacent to the structure. Bids were due by September 8, 2021.

There is no set-aside designation. The NAICS code is 237990 and PSC code is C213. Potential contractors include Coastal Marine Construction, LLC, Robert B Our Marine Division LLC, and Mohawk Northeast, Inc., with estimated values of accepted offers ranging from approximately $2.8 million to $4.8 million. The place of performance is Hyannis, Barnstable, Massachusetts.

Notice text

The purpose of the proposed project is to restore full functionality of the outer breakwater to meet its authorized purpose and to extend the repairs made in the 1960’s to enhance the durability of the structure using modern construction methods and practices.  The most recent maintenance of the outer breakwater at Hyannis Harbor was performed in the 1960s when approximately 800 feet of the originally constructed, parapet stone breakwater was adaptively reconstructed.  This was accomplished by repurposing some of the original parapet stones and by adding new armor-stone to form a rubble mound configuration.  The last 400 feet of the outer end of the breakwater was not repaired and remains vertically stacked, parapet stones dating back to the original construction in the 1890’s. Under this contract, similar to the 1960’s repair area, the last 400 feet of the structure will be adaptively reconstructed by adding new 5 to 7 ton stones and repurposing some of the parapet stones in a rounded, rubble-mound configuration that will dovetail into the 1960s repair area.  The remaining length of the breakwater (approximately 800 feet maintained in the 1960s) will be repaired to its existing dimensions by adding similarly sized stones and replacing stones that have been displaced from the structure.  Due to the location of the structure, the proposed work will need to be totally performed from marine based plant and no staging or storage of materials will be allowed in any areas adjacent to the structure.

Files

File Type Posted
BidAbstract.pdf PDF
Amendment 0001.pdf PDF
Drawings 070721.pdf PDF
W912WJ21B0014_Solicitation.pdf PDF
Specifications 070721.pdf PDF

Notice history

Notice Type Posted
Repairs to the Federal Navigation Project Breakwater at Hyannis Harbor, Barnstable, MA. Award Award Notice
This notice Latest solicitation Solicitation
Repairs to the Federal Navigation Project Breakwater at Hyannis Harbor, Barnstable, MA. Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
W9123627BA004: NASA Wallops Breakwater Project in Wallops Island, Virginia Wallops Island, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
Delaware Avenue Revetment, Cape May, NJ 08204 · NAICS 237990 ENDIST Philadelphia No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors