Repair, Spares, & Engineering Services Enterprise Contract Embedded Global Positioning System (GPS)/Inertial Navigation System (EGI)

Open Pre-Solicitation Posted

Solicitation number
FA8524-27-D-0602
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Warner Robins, Georgia 31098, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Sustainment Center is preparing to solicit repair, spares, and engineering services for Embedded GPS/Inertial Navigation System (EGI) components under a nine-year contract with performance spanning 10 September 2029 through 9 September 2038, with responses to this RFI due by 3 November 2026. No set-aside is anticipated.

The government has designated these systems as commercial items and does not possess technical data rights for them. Physical samples are not available for evaluation. Repair demand centers on two inertial navigation components (Federal Supply Class 6605): one NSN requiring 12 units annually and a second NSN requiring 100 units annually across all nine fiscal years, providing a baseline of sustained sustainment requirements.

The contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all required support equipment at either their facility or a subcontractor's facility. Replacement material or parts must equal or exceed the quality of original items. The government reserves the right to modify specific NSN requirements in future correspondence and does not commit that RFI participation will result in solicitation or contract participation. Respondents bear all participation expenses.

Notice text

This follow-on effort is planned for a nine-year Period of Performance (PoP) spanning 10 September 2029 through 9 September 2038. The initial forecasted repair requirements are detailed in the attached RFI_Master List of NSNs, though the government reserves the right to modify specific NSN requirements in future correspondence. The government does not possess nor have rights to the technical data for these items. Furthermore, the government has designated these systems as commercial items. Prospective sources are advised that physical samples of these items are not available for evaluation.

The contractor shall furnish all material, support equipment, tools, test equipment, and services.  The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts

Contractors/Institutions responding to this RFI are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

Files

File Type Posted
RFI_NGSC_EGI.pdf PDF
Attachment A_RFI_Master List of NSNs.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
N0038326PR0R795_FMS repair NAICS 334511 Naval Supply Systems Command No set-aside
Inertial navigation, in repair/modification of NAICS 334511 Naval Supply Systems Command No set-aside
Inertial reference, in repair/modification of NAICS 334511 Naval Supply Systems Command No set-aside
Inertial navigation, in repair/modification of Naval Supply Systems Command No set-aside
N0038326PR0R075_FMS NAICS 334511 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity