Repair Sewer Collector Inflow and Infiltration

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W519TC-23-R-2078
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Rock Island, Illinois 61299, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The federal contract opportunity involves a project to reduce and stop inflow and infiltration of the main sanitary collector trunk along the Sylvan Slough, particularly during flood conditions. The work includes cutting and removing 8 inches of existing CIPP liner, installing a hydrophilic neoprene seal that conforms to ASTM F3240-19, and preparing surfaces to seal manholes with a product resilient to hydrosulfate attack. The projected value of the contract is between $500,000 and $1,000,000.

List of services and products:

  1. Reduction and stoppage of inflow and infiltration of the main sanitary collector trunk along the Sylvan Slough.
  2. Cutting and removal of 8 inches of existing CIPP liner.
  3. Installation of a hydrophilic neoprene seal that conforms to ASTM F3240-19.
  4. Surface preparation for manhole sealing.
  5. Application of a product resilient to hydrosulfate attack for manhole sealing.

Notice text

This is a notice that a solicitation is anticipated to be forthcoming and will have all the necessary documents to include the Scope of Work. 

IAW FAR 36.204(e), the magnitude of this project is between $500,000.00 and $1,000,000.00.

Performance and Payment Bonds are required.

The scope of this project is to reduce and stop inflow and infiltration of the main sanitary collector trunk along the Sylvan Slough.  Inflow to this trunk line increases significanlty during flood conditions over River Stage 15ft. Cut and remove 8 inches of existing CIPP liner to create a mating edge for the installation of a properly engineer and seal(s) that is hydrophilic neoprene conforming to ASTM F3240-19 and is seamlessly constructed.  Perform necessary surface preparation (mechanically and chemically) to seal manholes with an approved product that is resilient to hydrosulfate attack, shall hold until substrate failure, and handle hydrostatic pressure from 30 feet water head and 15 feet of saturated soil. 

Notice history

Notice Type Posted
Repair Sewer Collector Inflow and Infiltration Latest solicitation Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors