Repair Sewer Collector Inflow and Infiltration
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W519TC-23-R-2078
- Agency
-
ACC Rock Island
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Rock Island, Illinois 61299, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The federal contract opportunity involves a project to reduce and stop inflow and infiltration of the main sanitary collector trunk along the Sylvan Slough, particularly during flood conditions. The work includes cutting and removing 8 inches of existing CIPP liner, installing a hydrophilic neoprene seal that conforms to ASTM F3240-19, and preparing surfaces to seal manholes with a product resilient to hydrosulfate attack. The projected value of the contract is between $500,000 and $1,000,000.
List of services and products:
- Reduction and stoppage of inflow and infiltration of the main sanitary collector trunk along the Sylvan Slough.
- Cutting and removal of 8 inches of existing CIPP liner.
- Installation of a hydrophilic neoprene seal that conforms to ASTM F3240-19.
- Surface preparation for manhole sealing.
- Application of a product resilient to hydrosulfate attack for manhole sealing.
Notice text
This is a notice that a solicitation is anticipated to be forthcoming and will have all the necessary documents to include the Scope of Work.
IAW FAR 36.204(e), the magnitude of this project is between $500,000.00 and $1,000,000.00.
Performance and Payment Bonds are required.
The scope of this project is to reduce and stop inflow and infiltration of the main sanitary collector trunk along the Sylvan Slough. Inflow to this trunk line increases significanlty during flood conditions over River Stage 15ft. Cut and remove 8 inches of existing CIPP liner to create a mating edge for the installation of a properly engineer and seal(s) that is hydrophilic neoprene conforming to ASTM F3240-19 and is seamlessly constructed. Perform necessary surface preparation (mechanically and chemically) to seal manholes with an approved product that is resilient to hydrosulfate attack, shall hold until substrate failure, and handle hydrostatic pressure from 30 feet water head and 15 feet of saturated soil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair Sewer Collector Inflow and Infiltration | Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity