Repair Roofs B760, B780
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S7Y24B0001
- Agency
-
Kansas National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Kansas Army National Guard is seeking bids for the repair of roofs on two buildings, Building 760 (Civil Engineer) and Building 780 (Dining Facility), totaling 27,175 square feet. The repair work requires the demolition of the existing roof and insulation, and the installation of a new roof system, including membrane, insulation, fasteners, exhaust and vent openings, drains, roof slope, parapet walls and flashing, roof access and ladders, lightning protection, grounding, and skylights. All roofing construction must adhere to UFC 3-110-03 and applicable UFGS sections. Bids are due by July 24, 2024.
This solicitation is set aside for small businesses. The work must be performed at the buildings located in Kansas. No incumbent or current contractor information is provided, and the potential award value or budget range is not specified.
Notice text
4 versions
Update #4 · Latest ·
Amendment 0003 to add bid abstract for all bids received.
Update #3 ·
Amendment 0002 to add formal questions and answers from post-site visit/pre-bid inquiries.
Update #2 ·
Amendment 0001 to add formal questions and answers for pre-site visit inquiries.
Update #1 ·
Repair 27,175 square feet of roof system on bldg. 760 Civil Engineer building and bldg. 780 Dining Facility. This repair requires the demolition of existing roof and insulation. Replace with new roof system membrane, insulation, fasteners, exhaust, and vent openings, other roof penetrations, provide adequate drains, roof slope, parapet walls and flashing, roof access and ladders, lightning protection, grounding, and skylights. All roofing construction requirements shall adhere to UFC 3-110-03 along with the replacement installation meeting all requirements within appropriate UFGS sections for selected roof system types. The Contractor is responsible for providing the materials, labor, equipment, permits, insurance, and supervision necessary to complete the work in accordance with the design.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair Roofs B760, B780 | Award Notice | |
| This notice | Solicitation | |
| Repair Roofs B760, B780 | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity