Repair radial separators

Awarded Award Notice Posted

Solicitation number
F17PS00779
Agency
DOI Fish and Wildlife Service Headquarters Region 9 Fish and Wildlife Service, Department of the Interior
Awarded
to 71 Construction
Set-aside
Total Small Business

Opportunity facts

Contract number
INF17PC00179 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Fws Saratoga National Fish Hatcheryp.O. BOX 665 County Road 207SARATOGAWY82331USA 82331 USA
More information

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Jun 13, 2017 3:45 pm Modified: Aug 04, 2017 2:00 pmTrack Changes Amendment 0002: Rehabilitation of three radial clarifiers, one of which is in need of repair from floating. The purpose of amendment 0002 is to update the drawings, clarify the specification and extend the proposal due date; change block 13 of SF1442, due date to Monday, 14 Aug 2017. The time remains 1700 MT.

Update #5 ·

Added: Jun 13, 2017 3:45 pm Modified: Jul 25, 2017 4:20 pmTrack Changes Amendment 0001: Rehabilitation of three radial clarifiers, one of which is in need of repair from floating. The purpose of this amendment is to extend proposal due date.

Update #4 ·

Added: Jun 13, 2017 3:45 pm Modified: Jun 27, 2017 2:22 pmTrack Changes The contractor will provide all plant, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work or other operations required for rehabilitation of three radial clarifiers, one of which is in need of repair from floating. The pipe connections to all three clarifiers will be checked and repaired as needed as well as the influent and effluent pipes. The effluent sludge pipes for all three clarifiers will be upgraded. The effluent pipe to the adjacent pond will be replaced with a 4 inch PVC pipe and the existing 2 inch effluent pipe to the Brauer ditch will be replaced with a 4 inch PVC pipe. All three clarifiers will be fitted with concrete collars which will have helical anchors imbedded into them and protruding 17 feet into the earth to ensure the clarifiers do not float in the future. The three existing 18 inch diameter gate valves will be retrofitted with square-nut adaptors and a T-handle for ease of use. The existing pump will be upgraded to a 5 hp pump. A new concrete pad surrounding all three clarifiers will be installed as well as a chain-link fence with a removable panel to allow for access. The Construction magnitude is between $250,000 and $500,000; with a budget toward the lower end of the magnitude. From a historical GeoTech report; Groundwater was encountered in 2011 ranging from 7.5 to 15 feet below existing ground surface. Another GeoTech report performed in 1993, encountered groundwater at depths of 6 to 16 feet.

Update #3 ·

Added: Jun 13, 2017 3:45 pm Modified: Jun 27, 2017 2:19 pmTrack Changes The contractor will provide all plant, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work or other operations required for rehabilitation of three radial clarifiers, one of which is in need of repair from floating. The pipe connections to all three clarifiers will be checked and repaired as needed as well as the influent and effluent pipes. The effluent sludge pipes for all three clarifiers will be upgraded. The effluent pipe to the adjacent pond will be replaced with a 4 inch PVC pipe and the existing 2 inch effluent pipe to the Brauer ditch will be replaced with a 4 inch PVC pipe. All three clarifiers will be fitted with concrete collars which will have helical anchors imbedded into them and protruding 17 feet into the earth to ensure the clarifiers do not float in the future. The three existing 18 inch diameter gate valves will be retrofitted with square-nut adaptors and a T-handle for ease of use. The existing pump will be upgraded to a 5 hp pump. A new concrete pad surrounding all three clarifiers will be installed as well as a chain-link fence with a removable panel to allow for access. The Construction magnitude is between $250,000 and $500,000; with a budget toward the lower end of the magnitude. From a historical GeoTech report; Groundwater was encountered in 2011 ranging from 7.5 to 15 feet below existing ground surface. Another GeoTech report performed in 1993, encountered groundwater at depths of 6 to 16 feet.

Update #2 ·

Added: Jun 13, 2017 3:45 pm Modified: Jun 27, 2017 1:33 pmTrack Changes The contractor will provide all plant, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work or other operations required for rehabilitation of three radial clarifiers, one of which is in need of repair from floating. The pipe connections to all three clarifiers will be checked and repaired as needed as well as the influent and effluent pipes. The effluent sludge pipes for all three clarifiers will be upgraded. The effluent pipe to the adjacent pond will be replaced with a 4 inch PVC pipe and the existing 2 inch effluent pipe to the Brauer ditch will be replaced with a 4 inch PVC pipe. All three clarifiers will be fitted with concrete collars which will have helical anchors imbedded into them and protruding 17 feet into the earth to ensure the clarifiers do not float in the future. The three existing 18 inch diameter gate valves will be retrofitted with square-nut adaptors and a T-handle for ease of use. The existing pump will be upgraded to a 5 hp pump. A new concrete pad surrounding all three clarifiers will be installed as well as a chain-link fence with a removable panel to allow for access. The Construction magnitude is between $250,000 and $500,000; with a budget toward the lower end of the magnitude. From a historical GeoTech report; Groundwater was encountered in 2011 ranging from 7.5 to 15 feet below existing ground surface. Another GeoTech report performed in 1993, encountered groundwater at depths of 6 to 16 feet.

Update #1 ·

Added: Jun 13, 2017 3:45 pm SOLICITATION ISSUE DATE AND DOCUMENTS WILL BE AVAILABLE ON/ABOUT 27 JUNE 2017. The contractor will provide all plant, tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work or other operations required for rehabilitation of three radial clarifiers, one of which is in need of repair from floating. The pipe connections to all three clarifiers will be checked and repaired as needed as well as the influent and effluent pipes. The effluent sludge pipes for all three clarifiers will be upgraded. The effluent pipe to the adjacent pond will be replaced with a 4 inch PVC pipe and the existing 2 inch effluent pipe to the Brauer ditch will be replaced with a 4 inch PVC pipe. All three clarifiers will be fitted with concrete collars which will have helical anchors imbedded into them and protruding 17 feet into the earth to ensure the clarifiers do not float in the future. The three existing 18 inch diameter gate valves will be retrofitted with square-nut adaptors and a T-handle for ease of use. The existing pump will be upgraded to a 5 hp pump. A new concrete pad surrounding all three clarifiers will be installed as well as a chain-link fence with a removable panel to allow for access. The Construction magnitude is between $250,000 and $500,000; with a budget toward the lower end of the magnitude.

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_F17PS00779_Amd_0001.pdf PDF
Atch_2_Saratoga_Seperators_Combined_Drawings.pdf PDF
Atch_5_Saratoga_Seperators_Submittals_List.pdf PDF
Sol_F17PS00779.pdf PDF
Atch_6_Saratoga_Seperators_Past_Perf_Quest.doc DOC document
Atch_3_Saratoga_Seperators_Drawing_Signed.pdf PDF
Atch_4_Saratoga_Seperators_DBA_Wage_Det.pdf PDF
Atch_1_Saratoga_Seperators_Specs.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Repair radial separators Latest Award Notice
Repair radial separators This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity