Repair of NSN 5985-01-599-4728
Closed Solicitation Posted
- Solicitation number
- FA825025Q0359
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 811210 Electronic and Precision Equipment Repair and Maintenance
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center is seeking a contractor to repair a Feed Assembly (NSN 5985-01-599-4728, Part Number 0239-504), utilizing a two-step process involving test, teardown, and evaluation (TT&E) followed by potential repair services. The solicitation requires the contractor to perform comprehensive visual, mechanical, and electrical testing to identify necessary repairs, with findings reported to the Procurement Contracting Officer and Defense Contract Management Agency. Contractors must be prepared to restore the antenna subassembly to serviceable like-new condition, adhering to original specifications and implementing a Counterfeit Prevention Plan. The Request for Quotation (RFQ) number FA8250-25-Q-0359 was issued on February 12, 2025, with quotes due by February 26, 2025, and contractors must hold quoted prices firm for 120 days. Evaluation will likely focus on the contractor's ability to meet technical requirements, repair capabilities, and compliance with specified reporting and quality standards.
The procurement is not set aside for small businesses and falls under NAICS code 811210 with a size standard of $34.00M. The contract includes multiple Contract Line Item Numbers (CLINs): CLIN 0001 for TT&E at a firm-fixed price and CLIN 0002 for repairs on a not-to-exceed basis. The item to be repaired is a fiberglass antenna measuring 32 inches in length, 18 inches in width, and 16 inches in height, weighing 25 pounds. Performance will occur at the contractor's facility, with the item originating from Hill Air Force Base in Utah. The contract requires electronic submission of payment requests through Wide Area Workflow (WAWF), with inspection and acceptance performed at the origin. Contractors must also comply with extensive reporting requirements, including daily Commercial Asset Visibility Air Force (CAVAF) reporting and monthly production reports detailing maintenance activities and asset status.
Notice text
- SCOPE OF WORK: (Two Step) For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair.
-
- TEST, TEARDOWN, AND EVALUATION: The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, approval to repair will be negotiated. If no further repair is required, the asset must be returned in serviceable like new condition.
-
- REPAIR: (NTE) The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable like new condition.
Below listed item(s) will be shipped to contractor to repair:
Item Description: FEED ASSEMBLY
NSN: 5985-01-599-4728
Part Number: 0239-504
Files
| File | Type | Posted |
|---|---|---|
| FA825025Q0359.pdf | ||
| DI-PSSS-81995_A002_CDM_Production_Report.pdf | ||
| PACKAGING_STATEMENT_OF_WORK.pdf | ||
| ITEM_UNIQUE_ID.pdf | ||
| CONTRACT_DATA_REQUIREMENTS_LIST.pdf | ||
| DI-MISC-81832_CPP.pdf | ||
| PACKAGING_REQUIREMENT.pdf | ||
| DI-MGMT-80441_A003_Government_Property_Inventory_Report.pdf | ||
| DI-SESS-80639E_ECO.pdf | ||
| DI-PSSS-80386A_RIIR.pdf | ||
| DI-MGMT-81838_A001.pdf | ||
| CAVAF_REPORTING_REQUIREMENTS.docx | DOCX document | |
| TRANSPORTATION.pdf | ||
| PERFORMANCE_WORK_STATEMENT.docx | DOCX document | |
| REPAIR_DATA_LIST.pdf | ||
| ITEM_DESCRIPTION.pdf |
Show all 16
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F16_APG68_DualModeTransmitter_Monitor_5998012744648_PN772R023G01 | Air Force Sustainment Center | No set-aside | |
| Sources Sought Synopsis: Repair of NSN: 5840-01-659-4499 | Air Force Sustainment Center | No set-aside | |
| F16_ANAPG68_PN-646R706G01_1270010778078 | Air Force Sustainment Center | No set-aside | |
| F16AN_APG_68_Radar_NSN5998012885420_PN_762R656G01 | Air Force Sustainment Center | No set-aside | |
| F16_AN_APG68_DualMonitor_NSN5998013035871_PN785R537G01 | Air Force Sustainment Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity