Repair Mechancial Room Floor (Asbestos Removal)

Award Notice Posted

Solicitation number
171repairmechrm
Agency
Awarded
to American Contracting Enterprises Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W912KC-17-P-0004 Federal contract award
NAICS code
562910 Remediation Services
PSC
Not on record
Place of performance
171 ARW 300 Tanker Rd Coraopolis, Pennsylvania 15108, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

**IMPORTANT**
This Solicitation is 100% SET ASIDE FOR SMALL BUSINESS who meet the Size Standards of NAICS Code 562910, Remediation Services ($20.5M in Annual Receipts).  Vendors need not be registered under NAICS 562910, however they must be at or under the Size Standard of $20.5M. 

Quotes will ONLY be accepted from vendors who participate in the Site Visit, scheduled for MONDAY, 9 JANUARY 2017 AT 10:00AM EST.  Vendors who participated in the 1 December 2016 Site Visit do not need to attend the 9 January Site Visit.


IN ORDER TO TAKE PART IN THE SITE VISIT, prospective vendors MUST email the following information to michael.w.boyd2.mil@mail.mil by 1:00PM EST on Friday, 06 January, 2017:


-Company Name


-Names of All Personnel Attending


-Drivers License State & Number of All Personnel Attending


STATEMENT OF WORK


Repair B102 Utility Room Floor


Project: JLSQ162019


Date: 16 June 2016


SCOPE: The work consists of furnishing all labor, materials, tools, equipment, supplies, transportation, supervision, and inspection required to perform all tasks described below.


LOCATION/SITE VISITS: This project is located at the Air National Guard Base, Pittsburgh International Airport, Pennsylvania, 15108-1940.

Site visits MUST be arranged through the 171st Contracting Section, Commercial (412) 776-7660.


GENERAL REQUIREMENTS:


A. Normal duty hours of operation at the base are:


1st week: Monday to Thursday from 0700 to 1630 hours as well as Friday from 0700 to 1530 hours


2nd week: Tuesday to Friday from 0700 to 1630 hours


B. Construction shall be accomplished according to a phased schedule to limit impact on airfield operations. In


specified phased areas, construction may be accomplished any time during the aforementioned hours unless the base is closed for a holiday.


C. Prior coordination with the Contracting Officer (CO) is required to work outside these hours.


PRINCIPLE ELEMENTS OF WORK:


A. Remove and dispose of asbestos containing materials in B102's utility room (room 108).


a. Contractor shall remove all existing asbestos in black mastic and 9'x9' VCT and properly dispose of debris and waste off site.


Contractor shall supply SDS for all products used on this project.


Contractor shall provide a report on materials removed from the project site. Indicate volume (CY) and tonnage of materials that are disposed in landfills. Indicate volume (CY) and tonnage of materials that are reused or recycled.


Indicate other methods of disposal as indicated on the report form provided.


A. Contractor must be approved and permitted to perform asbestos removal in Allegheny County. Permits and/or license will be submitted prior to NTP.


B. Removal of VCT under any permanently installed equipment is not required.


C. Disposal will be done using an EPA approved landfill. All copies of landfill receiving documents will be returned


to the contracting office upon completion of the project.


D. Air quality samples and test will be conducted by the contractor and results will be made available within 14 days of completion of remediation.

E. Room Size is 9 Feet by 9 Feet (9x9), or 81 Square Feet.

Update #1 ·

**IMPORTANT**
This Solicitation is 100% SET ASIDE FOR SMALL BUSINESS who meet the Size Standards of NAICS Code 562910, Remediation Services ($20.5M in Annual Receipts).  Vendors need not be registered under NAICS 562910, however they must be at or under the Size Standard of $20.5M. 

Quotes will ONLY be accepted from vendors who participate in the Site Visit, scheduled for MONDAY, 9 JANUARY 2017 AT 10:00AM EST.


IN ORDER TO TAKE PART IN THE SITE VISIT, prospective vendors MUST email the following information to michael.w.boyd2.mil@mail.mil by 1:00PM EST on Friday, 06 January, 2017:


-Company Name


-Names of All Personnel Attending


-Drivers License State & Number of All Personnel Attending


STATEMENT OF WORK


Repair B102 Utility Room Floor


Project: JLSQ162019


Date: 16 June 2016


SCOPE: The work consists of furnishing all labor, materials, tools, equipment, supplies, transportation, supervision, and inspection required to perform all tasks described below.


LOCATION/SITE VISITS: This project is located at the Air National Guard Base, Pittsburgh International Airport, Pennsylvania, 15108-1940.

Site visits MUST be arranged through the 171st Contracting Section, Commercial (412) 776-7660.


GENERAL REQUIREMENTS:


A. Normal duty hours of operation at the base are:


1st week: Monday to Thursday from 0700 to 1630 hours as well as Friday from 0700 to 1530 hours


2nd week: Tuesday to Friday from 0700 to 1630 hours


B. Construction shall be accomplished according to a phased schedule to limit impact on airfield operations. In


specified phased areas, construction may be accomplished any time during the aforementioned hours unless the base is closed for a holiday.


C. Prior coordination with the Contracting Officer (CO) is required to work outside these hours.


PRINCIPLE ELEMENTS OF WORK:


A. Remove and dispose of asbestos containing materials in B102's utility room (room 108).


a. Contractor shall remove all existing asbestos in black mastic and 9'x9' VCT and properly dispose of debris and waste off site.


Contractor shall supply SDS for all products used on this project.


Contractor shall provide a report on materials removed from the project site. Indicate volume (CY) and tonnage of materials that are disposed in landfills. Indicate volume (CY) and tonnage of materials that are reused or recycled.


Indicate other methods of disposal as indicated on the report form provided.


A. Contractor must be approved and permitted to perform asbestos removal in Allegheny County. Permits and/or license will be submitted prior to NTP.


B. Removal of VCT under any permanently installed equipment is not required.


C. Disposal will be done using an EPA approved landfill. All copies of landfill receiving documents will be returned


to the contracting office upon completion of the project.


D. Air quality samples and test will be conducted by the contractor and results will be made available within 14 days of completion of remediation.

E. Room Size is 9 Feet by 9 Feet (9x9), or 81 Square Feet.

Files

File Type Posted
AF_Form_66_-_Repair_Mech_Room_Floor.doc DOC document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors