Repair & Maintain Airfield Stormwater System Phase II

Closed Pre-Solicitation Posted

Solicitation number
FGWB21000AB_3
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Marietta, Georgia 30069, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Reserve Command intends to solicit a firm-fixed-price request for proposal for repair and maintenance of the airfield stormwater system at Dobbins Air Reserve Base, Georgia, with proposals due August 10, 2026. This is a 100% small business set-aside (NAICS 237110, Water and Sewer Line and Related Structures Construction; small business size standard $47 million).

Work encompasses repair of stormwater drainage systems east of Taxiway 'J', including regrading and sodding of failed slopes in basins III, IV, and V, cleaning of existing flumes, pipes, and swales to reestablish proper drainage patterns, and installation of new concrete flumes to prevent erosion and standing water. The 94th Contracting Flight classifies this under PSC Z2NZ (Repair or Alteration of Other Utilities). Construction magnitude is estimated between $10 million and $25 million with a period of performance of 420 calendar days. Contractors must provide bid, payment, and performance bonds. No foreign participation is permitted. The solicitation will be posted on or about July 9, 2026, on SAM.gov. Active SAM registration is required for award eligibility. All technical data will be provided as part of the solicitation. Contact Kevin Song, Contract Specialist, (678) 655-3695 or kevin.song@us.af.mil; alternate contact Kenneth Jacob, Contracting Officer, (678) 655-5745 or kenneth.jacob.1@us.af.mil.

Notice text

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

Files

File Type Posted
Pre Solicitation Notice_Drainage 2026_updated_5.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z2NZ-- 658-23-108 Correct Stormwater Drainage Salem, Virginia 24153, United States · NAICS 237110 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
JBMHH Stormwater Management Facility Maintenance and Repair Services Fort Myer, Virginia 22211, United States · NAICS 562998 MICC Fort Sam Houston No set-aside
FA8501-27-rapid-pave-OTA Warner Robins, Georgia 31088, United States · NAICS 324121 Air Force Sustainment Center No set-aside
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades Oklahoma City, Oklahoma 73169, United States · NAICS 237110 Franchise Acquisition Servies Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity