Repair Interior Ceiling Building 224
Closed Pre-Solicitation Posted
- Solicitation number
- FA5270MB224
- Agency
-
Pacific Air Forces
Air Force, Department of Defense
- Responses due
- Set-aside
- Local Area Set-Aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Kadena Air Base Okinawa 96368 Japan
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Pacific Air Forces is seeking a design-build contractor to repair the interior ceiling of Building 224 at Kadena Air Base in Okinawa, Japan. The project requires comprehensive renovation involving full Asbestos-Containing Material (ACM) abatement, ceiling paint removal, and repair of spalls and cracks across four distinct areas including the X-Ray Room. Key contract requirements include compliance with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japanese regulations. Contractors must demonstrate capability in hazardous material handling, sustainable design principles, and comprehensive facility renovation. The pre-solicitation notice was posted on March 18, 2025, with responses due by April 2, 2025, and contractors will need to submit an Environmental Protection Plan and AF Form 130 for work clearance before commencing construction activities.
The contract is designated as a Local Area Set-Aside under the Commercial and Institutional Building Construction NAICS category (236220). The total project period is 450 calendar days, subdivided into 132 days for design, 126 days for material submittal and procurement, and 192 days for on-site construction. While specific award value is not explicitly stated, the complexity of the project involving ACM abatement, electrical system modifications, and comprehensive facility restoration suggests a significant budget requirement. The project scope includes removing and reinstalling suspended ceilings, lighting fixtures, air conditioning units, and electrical components, with a primary objective of delivering a fully functional facility that meets all regulatory and operational standards. Contractors will be required to coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES) and ensure all work meets stringent sustainability and performance criteria.
Notice text
This project shall consist of but not limited to providing all field investigations, surveys,
design, plant, labor, materials, equipment, supplies, transportation, third-party services, and
incidental related work to design and execute construction work defined in this Statement of Work
and the attached documents. The work includes all necessary finishing work to provide the
Government with a final product that is fully functional and leaves no areas of the facility that
appear incomplete or unfinished.
This project shall accomplish a design-build repair the true ceiling of B224. Work includes
full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and
cracks. Include any site preparation work such as temporary removal of the suspended ceiling,
lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit.
Sustainable principles, to include life cycle cost- effective practices, will be integrated into
the design, development, and construction of the project in accordance with UFC 1-200-02, High
Performance and Sustainable Building Requirements.
The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or
other hazardous building materials.
The Contractor shall determine the best technical design solution in conformance with current
regulations. The design and construction work shall comply with US federal, Department of Defense,
Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not
specifically stated elsewhere in this project statement of work to provide a complete and usable
facility upon completion. The detailed Scope of Work is described here-in below and the attached supporting documents.
Construction activities may commence after the approval of the Environmental Protection Plan
(EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements
through 718th Civil Engineer Squadron (718 CES)
Files
| File | Type | Posted |
|---|---|---|
| 01_LXEZ241017_Repair Interior Ceiling_B224_SOW_20250227_R.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| P530 Aircraft Intermediate Maintenance Facility, Kadena Air Base, Okinawa, Japan | ENDIST Japan | No set-aside | |
| Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan | ENDIST Japan | No set-aside | |
| Commercial Solutions Opening - Kadena Air Base, Japan | Pacific Air Forces | No set-aside | |
| FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base, Japan | ENDIST Japan | No set-aside | |
| DCDO - HVAC Maintenance | Pacific Air Forces | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity