Repair Hog Island Channel Light (#17)

Award Notice Posted

Solicitation number
HSCGG1-16-B-PRV002
Agency
Awarded
to One Way Development, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
HSCGG1-16-C-PRV002 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Southwest end of Cape Cod Canal in Massachusetts, Massachusetts, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement to Replace Hog Island Channel Light REPAIR HOG ISLAND CHANNEL LIGHT (#17) located near the southwest end of Cape Cod Canal in Massachusetts.

This synopsis is issued in accordance with FAR Parts 5, 14, and 19. This acquisition is a TOTAL SMALL BUSINESS SET-ASIDE. The small business size standards for this NAICS code (237990) is $36.5M. PSC - Z1KB.

Estimated magnitude of this project is between $100,000 and $200,000.

Performance period is 105 days: 10 days for bonds, 65 days for submittals/admin, and 30 consecutive days for on-site construction; typical weather will not extend the performance period.  Complete work no later than 29 April 2016.

The Government intends to invite bids on or around 25 November 2015.
Bids due date is extended to 06 January 2016.

A bid guarantee will be required in the amount of 20% of the total bid. Payment and performance bonds will be required from the awardee in the amount of 100% of the total award.

Bids must be valid for a minimum of 60 days.

This is an FY16 project, and is subject to the availability of funds. Award will not be made unless/until funds are available. The Government reserves the right to cancel this solicitation at any time.

Any amendments to the solicitation will be posted on this website (FBO.gov). Bidders are required to acknowledge with their bid any and all amendments.

Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work:

1.  Remove and store all equipment from the existing structure

2.  Install new anchor points, a new 5' x 5' structure (provided by the Government, 15' high) and install the stored equipment

3.  Prepare surface of sheet pile bulkhead and apply new coating of rust converter primer and epoxy

4.  Install two new 10" cleats on the concrete platform

5.  Patch all concrete spalls and cracks

6.  Demolition must begin no later than approximately 1 April 2016, before birds can nest and occupy the existing structure

All amendments must be acknowledged.  See attached Amendment A01.

Contractor shall mobilize on or around 28 MAR 2016 and shall complete on-site construction work no later than 29 APR 2016.  Once mobilized, the Contractor shall take reasonble care to prevent wildlife from building and/or occupying any nest.

Per Amendment A02, the hour and date specified for receipt of offers was extended to 2PM, Warwick time on 6 January 2016.

Update #2 ·

All amendments must be acknowledged.  See attached Amendment A01.

Contractor shall mobilize on or around 28 MAR 2016 and shall complete on-site construction work no later than 29 APR 2016.  Once mobilized, the Contractor shall take reasonble care to prevent wildlife from building and/or occupying any nest.

The hour and date specified for receipt of Offers is NOT extended.

Update #1 ·

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement to Replace Hog Island Channel Light REPAIR HOG ISLAND CHANNEL LIGHT (#17) located near the southwest end of Cape Cod Canal in Massachusetts.

This synopsis is issued in accordance with FAR Parts 5, 14, and 19. This acquisition is a TOTAL SMALL BUSINESS SET-ASIDE. The small business size standards for this NAICS code (237990) is $36.5M. PSC - Z1KB.

Estimated magnitude of this project is between $100,000 and $200,000.

Performance period is 105 days: 10 days for bonds, 65 days for submittals/admin, and 30 consecutive days for on-site construction; typical weather will not extend the performance period.

The Government intends to invite bids on or around 25 November 2015.
Expected bid due date: 29 December 2015.

A bid guarantee will be required in the amount of 20% of the total bid. Payment and performance bonds will be required from the awardee in the amount of 100% of the total award.

Bids must be valid for a minimum of 60 days.

This is an FY16 project, and is subject to the availability of funds. Award will not be made unless/until funds are available. The Government reserves the right to cancel this solicitation at any time.

Any amendments to the solicitation will be posted on this website (FBO.gov). Bidders are required to acknowledge with their bid any and all amendments.

Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work:

1.  Remove and store all equipment from the existing structure

2.  Install new anchor points, a new 5' x 5' structure (provided by the Government, 15' high) and install the stored equipment

3.  Prepare surface of sheet pile bulkhead and apply new coating of rust converter primer and epoxy

4.  Install two new 10" cleats on the concrete platform

5.  Patch all concrete spalls and cracks

6.  Demolition must begin no later than approximately 1 April 2016, before birds can nest and occupy the existing structure

Files

Show all 11