Repair and Maintenance of Service Gates 3, 4 & 8 at Franklin Falls Dam; Franklin, NH
Award Notice Posted
- Solicitation number
- W912WJ13Q0087
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Awarded
- to R.m. Technologies, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912WJ-13-M-0173 Federal contract award
- NAICS code
- 238290 Other Building Equipment Contractors
- PSC
- Not on record
- More information
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
It is the intent of this contract to make repairs and perform maintenance work on service gates #3, #4 & #8 in the gatehouse at the U.S. Army Corps of Engineers Franklin Falls Dam per the drawings and specificaitons. The work includes, but is not limited to: 1) Replace five sheaves in teh bottom sheave block and reahbilitate the lower sheave block for each gate. The sheave pin and bushing shall be replaced. A grease fitting shall be installed for the sheave pin; 2) Remove and dispose of the existing hoist cable from the 70 ton capacity hoist; 3) Furnish and install 1,080 LF of new wire rope hoist cable for each service gate. Total Length for both gates 2,160 LF; 4) Reset hoist mechanism controls and limit switches; 5) Test gates to ensure proper operation and; 6) Clean up premises at conclusion of job.
Update #1 ·
It is the intent of this contract to make repairs and perform maintenance work on service gates #3, #4 & #8 in the gatehouse at the U.S. Army Corps of Engineers Franklin Falls Dam per the drawings and specifications. The work includes, but is not limited to: 1) Replace five sheaves in the bottom sheave block and rehabilitate the lower sheave block for each gate. The sheave pin and bushing shall be replaced. A grease fitting shall be installed for the sheave pin; 2) Remove and dispose of the existing hoist cable from the 70 ton capacity hoist; 3) Furnish and install 1,080 LF of new wire rope hoist cable per each service gate. Total length for both gates 2,160 LF; 4) Reset hoist mechanism controls and limit switches; 5) Test gates to ensure proper operation and; 6) Clean up premises at conclusion of job.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity