Repair Aircraft Fire Trainer

Closed Pre-Solicitation Posted

Solicitation number
Reference-Number-F1B3R28018A001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
Not on record
Place of performance
303 J Ave Bldg 302Altus AFB, OK 73523

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Altus Air Force Base has a requirement for the following commercial service: Repair Aircraft Fire Trainer.

All offerors doing business with the government MUST register in the DOD Central Contractor Registry (CCR) database prior to receipt of submittals. Failure to register in the CCR database will render your firm ineligible for review and possible award. CCR registration may be accomplished online at: http://www.ccr.gov. Additional information concerning CCR registration may be obtained by calling: 1-888-227-2423. All firms must also be registered with the Online Representations and Certifications Application (ORCA) website prior to receipt of submittals in order to be considered for award. This may be accomplished at: http://orca.bpn.gov/. The single source of entry for all documentation pertaining to this acquisition will be on the government procurement website at the following web address: http://www.fedbizopps.gov. All interested parties are responsible for checking this website to ensure they have the most current information (i.e. amendments issued, changes to the Statement of Work, etc). Faxed requests for a solicitation package will not be accepted. Points of Contact for this acquisition include: SSgt Kelly Vanett, Contract Administrator (580-481-7545) and Mr. Michael Schuman, Contracting Officer (580-481-5838). The NAICS code for this acquisition is: 811310. The solicitation is anticipated to be electronically posted on or about 29 Feb 08. Additional information concerning this project, to include details for a scheduled site visit, will be introduced at that time. This synopsis is not to be construed as a commitment by the government for reimbursement of any kind. Thank you very much for your interest.

Update #1 ·

Statement of WorkRepair Aircraft Fire Trainer

Altus AFB, Oklahoma



SCOPE:



1. The contractor shall provide all labor, materials, and equipment to repair the left side of the Aircraft Fire Trainer located on Altus AFB. The project will consist of locating and removing all air piping, which is located in the Aircraft Fire Trainer pit area. The current plumbing is badly rusted and leaking in several locations and is unsuitable for repair. The contractor shall locate and remove the old plumbing, establish a suitable transition area at the approximate edge of the weir pit, fabricate and concrete transition vault, locate old and new plumbing at the new transition vault, and supply new stainless steel plumbing from the vault to each of the coax propane valves located in their respective vaults along side the trainer. The contractor will return the trainer and site area to operational condition, and provide certification for operations.





PRINCIPAL FEATURES:



1. Aircraft Fire Trainer - LEFT SIDE



a. Locate old air system plumbing from the coax valves on left side of mock up inboard and outboard engines, auxiliary power unit (APU), wheel well, passenger, cockpit, battery, left rear, left wing, and left front props.

b. Uncover all the plumbing to expose the lines from the mock up props coax valves to a transition point to be located at the edge of the weir pit.

c. Cut and thread on transition / dielectric couplings at the transition.

d. Fabricate and install a concrete transition vault with lid to have 6 inch walls and 1/4 inch galvanized or equal lid.

e. Supply all new stainless steel pipe and fittings, 450 pounds per square inch (PSI) minimum rating.

f. Install new stainless steel pipe and fittings from the transition to each coax valve.

g. Remove and rebuild as needed each coax valve.

h. Refit each coax valve and plumbing in there respective vaults.

i. Replace all gravel and level the site per TO-35.

j. Provide pressure testing of each plumbing line.

k. Provide an inspection report and certification of the trainer per TO-35.



2. Contractor shall provide a detailed list of unforeseen parts and labor hours to the contracting office for pre- approval of any work that is to be accomplished to repair any major damage found outside the scope of this project as described herein.



3. Contractor shall provide a detailed drawing showing the location of all new plumbing, fittings, and transition vault.



4. Contractor shall provide a written certification per TO-35e1-2-13-1 within 14 days of completion of work.



5. Contractor shall supply all new materials conforming to ANSI standards.





END STATEMENT OF WORK





***NOTE***

FOR A COPY OF TO-35 CONTACT THE INDIVIDUAL NAMED BELOW.

Files

File Type Posted
Amendment.doc DOC document
Solicitation.doc DOC document
TO35E1-2-13-1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors