Solicitation Notice: Renovation to Structures Including Asbestos Removal at Oahe Dam, SD

Awarded Award Notice Posted

Solicitation number
W9128F18B0004
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Awarded
to Dean Kurtz Construction Company
Set-aside
Total Small Business

Opportunity facts

Contract number
W9128F18C0018 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
28563 Powerhouse Road Pierre, South Dakota 57501, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Apr 19, 2018 8:49 am Modified: May 10, 2018 10:15 amTrack Changes This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION.


Return with offer: 
Information required by section 00 10 00 (SF1442), and section 00 45 00.


Site Visit:
A site visit is scheduled for 23 May 2018 at 10:00 am. Contractors interested in seeing the site need to make reservation with Jason Taylor at (605) 945-3416 or by e-mail at Jason.R.Taylor@usace.army.mil


ProjNet:
Technical inquiries and questions relating to technical requirements, bidding procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/ No Later Than ten (10) calendar days before bid opening. All timely questions and approved answers will be made available through ProjNet.

See Division 00, Section 00 21 00, Part 1.33.1 (Bidder Inquiry) for instructions on registration for ProjNet Bidder Inquiry Access.


The Solicitation Number is: W9128F18B0004
The Bidder Inquiry Key is: BBK5AZ-D6XX6W


Project Description: (Approx. quantities)
The Oahe Project has identified a need to remove and replace deteriorating panels and insulation in each of the seven hoist motor rooms at the intake structure. The panels and insulation are located on the ceilings and walls in each of the rooms. The materials were tested for asbestos and results show that asbestos is present in the wall panels but not the insulation. It is assumed that the ceiling panels contain asbestos since the design drawing indicate they are ‘cementos.'
The basic scope of work for this construction contract will be twofold: demolition and renovation. The demolition phase will include the permitting, abatement/removal, transportation, and disposal of all panels with ACM and all insulation. The Project Office will supply electrical clearance but there will be some level of effort for the contractor to TEMPORARILY move/remove items such as conduit, brackets, etc. It is assumed that the wooden blocking behind the insulation should be acceptable for reuse in fastening the new materials. The nails or fasteners that were used previously will have to be removed. The renovation will include the installation of new insulation and panels that are moisture resistant. Total thickness of the current transite board (3/16") and insulation (1") is 1 and 3/16." The thickness of the replacement panel and insulation cannot exceed the prior thickness due to the presence of conduit, equipment, etc. that is off set from the walls. 


The estimated construction cost of this project is between $500,000 and $1,000,000.


_______________________________________________________________________________


The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 240 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety.


Bidders (Offerors): 


Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.


 


ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated. 


 


 


 

Update #1 ·

Added: Apr 19, 2018 8:49 am On or about 09 May 2018, this office will issue an Invitation for Bid for the Renovation of Structures Including Asbestos Removal at Oahe Dam, SD. The Invitation for Bid will close on or about 12 June 2018.


This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION.


A site visit date and time will be issued with the advertisement package.
_______________________________________________________________________________

Project Description: (Approx. quantities)


The Oahe Project has identified a need to remove and replace deteriorating panels and insulation in each of the seven hoist motor rooms at the intake structure. The panels and insulation are located on the ceilings and walls in each of the rooms. The materials were tested for asbestos and results show that asbestos is present in the wall panels but not the insulation. It is assumed that the ceiling panels contain asbestos since the design drawing indicate they are ‘cementos.'

The basic scope of work for this construction contract will be twofold: demolition and renovation. The demolition phase will include the permitting, abatement/removal, transportation, and disposal of all panels with ACM and all insulation. The Project Office will supply electrical clearance but there will be some level of effort for the contractor to TEMPORARILY move/remove items such as conduit, brackets, etc. It is assumed that the wooden blocking behind the insulation should be acceptable for reuse in fastening the new materials. The nails or fasteners that were used previously will have to be removed. The renovation will include the installation of new insulation and panels that are moisture resistant. Total thickness of the current transite board (3/16") and insulation (1") is 1 and 3/16." The thickness of the replacement panel and insulation cannot exceed the prior thickness due to the presence of conduit, equipment, etc. that is off set from the walls.


The estimated construction cost of this project is between $500,000 and $1,000,000.
_______________________________________________________________________________


The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 240 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety.

Bidders (Offerors):
Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.

ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated.  

Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov).

Find solicitation announcement in Fed Biz Opps (www.fbo.gov)
1. Use the ‘Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities' (large arrow in the middle of the page) or use the ‘Opportunities' tab followed by the ‘Advanced Search' tab.
2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files' or from the ‘Packages' tab.
4. If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors' tab and then ‘Add me to Interested Vendors' link at the bottom of the page.


FAR 52.232-18 Availability of Funds --Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

Attachments

Files attached to this notice, newest first
File Type Posted
Abstract_for_FBO_for_W9128F18B0004.pdf PDF
Am0001.pdf PDF
Asbestos_Contract_PreBidSIteVisit_Notes.pdf PDF
Intake_Asbestos_Contract_PreBidSite_SigninSheet.pdf PDF
Asbestos_Oahe_Specs__Dwgs.pdf PDF