Remanufacture/Overhaul of C‐130, C‐5, C‐17, E‐3, E‐4, E‐8, and C‐135 Tank, Liquid Oxygen

Closed Solicitation Posted

Solicitation number
FA8118-21-R-0045
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

Notice text

REMANUFACTURE
(a) This is a remanufacture meeting the requirements at FAR 22.1003‐6(a)(1).
The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the
remanufacture required to restore the piece(s) of equipment to original life expectancy, or nearly so. The contractor shall also
accomplish all necessary packing and preservation and packaging. ALL work shall be completed in accordance with the
requirements specified herein (including attachments hereto) and at the unit price(s) established at the time of award.
(b) A Pre‐Award Survey or Initial Production Evaluation (IPE) is not required.
(c) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the
remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the
Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed
item(s).
(d) Condemned units shall not be counted as production.
(e) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable
requirements. If the contractor estimates that any item is not reparable (i.e. beyond remanufacture), the Contractor shall
promptly notify the administrative contracting officer in writing and shall not perform further remanufacture on any such items
except at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a
particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO.
(f) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as
“estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government
Property clause of the contract.

Files

File Type Posted
2937274_PKGRQMT_REPORT.pdf PDF
CAVAF Rep.docx DOCX document
2937106_SOW.pdf PDF
2937276_TRNSPDATA_REPORT.pdf PDF
FA811821R0045.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Remanufacture/Overhaul of C‐130, C‐5, C‐17, E‐3, E‐4, E‐8, and C‐135 Tank, Liquid Oxygen Pre-Solicitation
Remanufacture of C-130, C-5, C-17, E-3, E-4, E-8, and C-135 TANK, LIQUID OXYGEN Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors