Remanufacture B-1 Horizontal Stabilizer Servo-Cylinder

Closed Solicitation Posted

Solicitation number
FA811825R0084
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Air Force Sustainment Center is soliciting proposals for the remanufacture of B-1 Horizontal Stabilizer Servo-Cylinders under a five-year firm-fixed-price requirements contract. The procurement covers the complete remanufacturing process to restore servo-cylinders to like-new condition, including disassembly, cleaning, inspection, maintenance, reassembly, testing, and finishing, along with all necessary packing, preservation, and packaging. Contractors must furnish all materials, plant facilities, labor, parts, equipment, and expertise required for the work, with all costs associated with work specifications and technical orders included in the unit price. The award will be made to the lowest total evaluated price offeror, with price as the only evaluated factor. The original proposal deadline of January 15, 2026 was extended through Amendment 0001 to February 18, 2026, and subsequently extended again through Amendment 0002 to March 18, 2026 at 1:00 PM CST. Offerors are not required to submit certified cost or pricing data at the time of proposal, though such data may be requested if adequate price competition is not demonstrated after proposal receipt.

This solicitation does not include a small business set-aside, though the government has identified a size standard of 1,250 employees for NAICS code 336413. The contract covers four servo-cylinder part numbers (L5873400-061, L5873400-062, L5873400-071, and L5873400-072) with National Stock Numbers 1650-01-253-7848, 1650-01-249-1788, 1650-01-543-4395, and 1650-01-543-3024, with government-furnished property consisting of 30 total servo-cylinders across multiple line items valued at between $283,584 and $435,566 per unit. The contract requires ISO 9001-2015 certification and a minimum summary level score of 110 in the Supplier Performance Risk System (SPRS), and mandates that contractors have qualifying sources per the Justification for Qualification Requirements, with approved overhaul sources including Smiths Aerospace Actuation Systems, Moog Inc., and Boeing. Performance of work shall occur in the United States, with deliveries to DLA Distribution Depot Oklahoma at Tinker Air Force Base. A Pre-Award Survey and Initial Production Evaluation are required, and contractors must comply with extensive reporting requirements including daily Commercial Asset Visibility reporting, monthly production reports, annual government property inventory reports, and production surge planning within 30 days of award.

Notice text

2 versions

Update #2 · Latest ·

NOTE: AMENDMENT 0002 - EXTENDS CLOSE DATE TO 3/18/26 AT 1:00PM CST.

NOTE: AMENDMENT 0001 - EXTENDS CLOSE DATE TO 2/18/26 AT 1:00PM CST.

REMANUFACTURE

A 5-YEAR FIRM-FIXED PRICE REQUIREMENTS CONTRACT IS CONTEMPLATED.

NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1).  
52.232-18 Availability of Funds.  As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.  (End of clause)
(a)  A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required.  Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.

(b)  The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition.  The contractor shall also accomplish ALL necessary packing and preservation and packaging.  ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price.  The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
 
(c)  Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009.  Email: afsc.sb.workflow@us.af.mil  Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/.  DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE.

429SCMS.SASPO.Workflow@us.af.mil

For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/

As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.

(d)  In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin at dessie.breslin@us.af.mil AND Amy Gil at amy.gil@us.af.mil.  Release of any data is subject to applicable data rights.  The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345.  The form, including instructions for completing the form, is available at:  http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html.  The Government is not responsible for incomplete, misdirected, or untimely requests.**

In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp.  Contractors who need an account will need to complete the instructions at the above link.

(e)  GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

(f)  END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).

(g)  If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further on any such items except after receipt of approval from the direction of the procurement contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the PCO.

Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.

(h)  Condemned units shall not be counted as production.

(i)  In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.

(j)  In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.  The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.

(k)  Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.

(l)  Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.

(m)  Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond economical repair of limits specified in the Work Specification and/or Technical Orders.  All cost for work performed by the contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).  

(n)  In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.

(o)  In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility.  DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan with their proposal to become compliant.
 

Update #1 ·

NOTE: AMENDMENT 0001 - EXTENDS CLOSE DATE TO 2/18/26 AT 1:00PM CST.

REMANUFACTURE

A 5-YEAR FIRM-FIXED PRICE REQUIREMENTS CONTRACT IS CONTEMPLATED.

NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1).  
52.232-18 Availability of Funds.  As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.  (End of clause)
(a)  A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required.  Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.

(b)  The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition.  The contractor shall also accomplish ALL necessary packing and preservation and packaging.  ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price.  The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
 
(c)  Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009.  Email: afsc.sb.workflow@us.af.mil  Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/.  DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE.

429SCMS.SASPO.Workflow@us.af.mil

For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/

As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.

(d)  In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin at dessie.breslin@us.af.mil AND Amy Gil at amy.gil@us.af.mil.  Release of any data is subject to applicable data rights.  The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345.  The form, including instructions for completing the form, is available at:  http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html.  The Government is not responsible for incomplete, misdirected, or untimely requests.**

In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp.  Contractors who need an account will need to complete the instructions at the above link.

(e)  GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

(f)  END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).

(g)  If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further on any such items except after receipt of approval from the direction of the procurement contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the PCO.

Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.

(h)  Condemned units shall not be counted as production.

(i)  In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.

(j)  In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.  The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.

(k)  Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.

(l)  Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.

(m)  Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond economical repair of limits specified in the Work Specification and/or Technical Orders.  All cost for work performed by the contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).  

(n)  In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.

(o)  In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility.  DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan with their proposal to become compliant.
 

Files

File Type Posted
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
DI MGMT 80503 Report of Shipping Packaging Discrepancy.pdf PDF
Transportation Data Report.pdf PDF
CAV AF Reporting Requirements.pdf PDF
DI MGMT CDM Montly Production Report.pdf PDF
ItemDescription_3024_Redacted.pdf PDF
IUID_3024_Redacted.pdf PDF
DI MGMT Production Surge Plan.pdf PDF
ItemDescription_7848_Redacted.pdf PDF
GFP.pdf PDF
FA811825R0084.pdf PDF
Special Packaging Instructions _1787.pdf PDF
SOW.pdf PDF
DI MGMT Govt Property Inventory Report.pdf PDF
IUID_4395_Redacted.pdf PDF
IUID_7848_Redacted.pdf PDF
JQRR.pdf PDF
Packaging Requirements.pdf PDF
ItemDescription_1788_Redacted.pdf PDF
IUID_1788_Redacted.pdf PDF
CDRL.pdf PDF
ItemDescription_4395_Redacted.pdf PDF
DI_MGMT_CAV_Reporting.pdf PDF
Show all 24

Similar open opportunities

Opportunity Agency Set-aside Responses due
Remanufacture of B-2 Actuator, Electromechanical, Rotary United States · NAICS 336413 Air Force Sustainment Center No set-aside
Servocylinder assem, in repair/modification of Naval Supply Systems Command No set-aside
Servocylinder assem, in repair/modification of Naval Supply Systems Command No set-aside
RFP- FD20301901983_FA811824R0035 -0003 OH B2 ACTUATORS (Amendment -0003 ) Tinker AFB, Oklahoma 73145, United States · NAICS 336413 Air Force Sustainment Center No set-aside
FD2030-27-00138 NAICS 336413 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity