Relief Well Pumping at the Chena River Lakes Flood Control Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911KB22R0018
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541380 Testing Laboratories and Services
- PSC
- B599 Special Studies/Analysis- Other
- Place of performance
- North Pole, Alaska 99705, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks to procure relief well pumping services at the Chena River Lakes Flood Control Project located in North Pole, Alaska. The U.S. Army Corps of Engineers Engineering District Alaska requires contractors to provide all necessary labor, equipment, supplies and materials to perform relief well pumping, including well screen brushing, sediment removal, step draw-down testing to determine well efficiency at given pumping rates, and a well maintenance pumping report. Proposals are due by March 21, 2022. The agency will evaluate proposals based on technical qualifications, past performance, and price.
This is a total small business set-aside opportunity. The primary NAICS code is 237130 and PSC code R499. Work will be performed in North Pole, Alaska. This requirement is for on-call relief well pumping services over a one year period to support flood control operations. Contractors must be able to mobilize within 72 hours of a call for pumping services.
Notice text
5 versions
Update #5 · Latest ·
Relief Well Pumping at the Chena River Lakes Flood Control Project: Provide all management, labor, equipment, travel, supplies, materials to perform relief well pumping at the Chena River Lakes Flood Control Project located approximately 18 miles east of Fairbanks, Alaska near the town of North Pole. Work includes well screen brushing, sediment removal, step draw-down testing to determine well efficiency at given pumping rates, and a well maintenance pumping report.
Updated 4 March 2022 to include Amendment 1.
Updated 10 March 2022 to include Amendment 2.
Updated 21 March 2022- If you are unable to upload the proposal to PIEE, please send the proposal via email to Jennifer Gosh at Jennifer.Gosh@usace.army.mil with a courtesy copy to the Contracting Officer Christine Dale at Christine.A.Dale@usace.army.mil.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB22R0018' to obtain more details.*
Update #4 ·
Relief Well Pumping at the Chena River Lakes Flood Control Project: Provide all management, labor, equipment, travel, supplies, materials to perform relief well pumping at the Chena River Lakes Flood Control Project located approximately 18 miles east of Fairbanks, Alaska near the town of North Pole. Work includes well screen brushing, sediment removal, step draw-down testing to determine well efficiency at given pumping rates, and a well maintenance pumping report.
Updated 4 March 2022 to include Amendment 1.
Updated 10 March 2022 to include Amendment 2.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB22R0018' to obtain more details.*
Update #3 ·
Relief Well Pumping at the Chena River Lakes Flood Control Project: Provide all management, labor, equipment, travel, supplies, materials to perform relief well pumping at the Chena River Lakes Flood Control Project located approximately 18 miles east of Fairbanks, Alaska near the town of North Pole. Work includes well screen brushing, sediment removal, step draw-down testing to determine well efficiency at given pumping rates, and a well maintenance pumping report.
Updated 4 March 2022 to include Amendment 1.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB22R0018' to obtain more details.*
Update #2 ·
Relief Well Pumping at the Chena River Lakes Flood Control Project: Provide all management, labor, equipment, travel, supplies, materials to perform relief well pumping at the Chena River Lakes Flood Control Project located approximately 18 miles east of Fairbanks, Alaska near the town of North Pole. Work includes well screen brushing, sediment removal, step draw-down testing to determine well efficiency at given pumping rates, and a well maintenance pumping report. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB22R0018' to obtain more details.*
Update 18 Feb 22: Updated Time Zone to Alaska, Added Place of Performance, Added Contracting Officer,
Update #1 ·
Relief Well Pumping at the Chena River Lakes Flood Control Project: Provide all management, labor, equipment, travel, supplies, materials to perform relief well pumping at the Chena River Lakes Flood Control Project located approximately 18 miles east of Fairbanks, Alaska near the town of North Pole. Work includes well screen brushing, sediment removal, step draw-down testing to determine well efficiency at given pumping rates, and a well maintenance pumping report. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB22R0018' to obtain more details.*
Notice history
| Notice | Type | Posted |
|---|---|---|
| Relief Well Pumping at the Chena River Lakes Flood Control Project | Award Notice | |
| This notice | Solicitation | |
| Relief well pumping at the chena river lakes flood control project | Pre-Solicitation | |
| Relief well pumping at the chena river lakes flood control project | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity