Rehabilitate Wawona Wastewater Treatment Plant, YOSE 196447
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 140P2019R0040
- Agency
-
National Office
National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Yosemite National Park Wawona, California 95389, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks capabilities statements for the rehabilitation of the Wawona Wastewater Treatment Plant located in Yosemite National Park, California. The National Park Service intends to conduct a competitive acquisition for the project, which includes updating processes, improving energy efficiency, increasing treatment capacity, onsite solids handling, and compliance with treatment standards. Interested firms must demonstrate experience with similarly sized civil construction, sewer utility, and wastewater treatment facility repairs through responses no more than six pages addressing specialized skills in these areas. Responses are due by March 8, 2019.
There is no set-aside designated for this potential award. The NAICS code is 237110 and work is estimated to cost over $10 million, with a period of performance from October 2019 through May 2021. Interested firms must also provide proof of bonding capacity. Specialized experience includes construction in occupied areas, temporary utilities, phasing of work, and working in remote locations.
Notice text
The National Park Service has a requirement for the following project. If you are interested, please submit your detailed capabilities in WRITING to demonstrate same or similar experience. This is not a request for proposal or invitation to bid. No proposal package, solicitation, specification or drawings are available with this announcement. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. If you choose to submit a package, clearly identify the park and project on your package: (YOSE 196447) and identify your socioeconomic status (8(a), HUBZone, Service Disabled Veteran, WOSB, EDWOSB, and Small).
The Government anticipates conducting a competitive acquisition for this requirement. Analysis of the quality of responses to this sources sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc.-see 13 CFR 121.108. All firms should be registered and certified in www.SAM.gov.
Project Details:
Yosemite National Park
Rehabilitate Wawona Wastewater Treatment Plant
NAICS Code: 237110
Estimated Cost Range: More than $10 million
Estimated Period of Performance: October 2019 - May 2021
Project Description
1. The Work includes the rehabilitation of the over 30-year-old Wawona Wastewater Treatment Plant (WWTP). Rehabilitation includes updating processes to contemporary standards, improved energy efficiency, increased and improved plant treatment capacity, creation of onsite solids handling, compliance with current and anticipated treatment standards, and adaptability to low winter and high summer flows.
2. The Work includes the addition of offices and workroom, upgrade of toilet rooms and replacement of miscellaneous items for ABA accessibility.
3. The Work includes the replacement of the golf course irrigation system, the golf course irrigation pump, all controls associated with the irrigation system, electrical service to the new facilities, testing of the new system, programming the system to integrate to the WWTP SCADA system, and construction sequencing while continuing to dispose of all necessary wastewater generated at the WWTP.
4. The Work includes construction of a subsurface disposal system within Fairway 7 of the existing golf course. The work includes clearing of the existing fairway, installation of the transmission pipelines, distribution facilities, monitoring facilities, and restoration of the fairway grades and sod. Work would be coordinated with existing WWTP operations to allow for disposal of treated effluent generated at the WWTP.
5. The Work includes removal of the existing River Discharge Pipeline.
Project will be constructed under a single prime contract. The Work shall be conducted in phases so as to maintain operation of the wastewater treatment system throughout construction. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts, specifically Replace Wawona Campground Septic & Leach Field System for replacement of six campground restroom sewage disposal leach fields with a new connection to the Wawona wastewater system.
Response
Your response is due no later than 2:00 pm Mountain Time on March 8, 2019. Send your email responses to Sharon_Miner@nps.gov. Your email capability information MUST be six pages or less and be SPECIFIC to the scope provided.
FIRMS INTERESTED IN THE PROJECT SHOULD POSSESS THE FOLLOWING SPECIALIZED SKILLS AND EXPERIENCE AND SHOULD ADDRESS THESE SPECIALIZED SKILLS AND EXPERIENCE IN THEIR RESPONSES TO THIS NOTICE:
1. Experience with similarly sized civil construction, sewer utility, and wastewater treatment facility repairs and rehabilitation, including commissioning of wastewater treatment plant.
2. Experience constructing within work areas in use by residents and/or workers and temporary utilities and/or phasing of work to ensure ongoing utility service during work.
3. Experience with construction at remote and difficult to access sites.
4. Bonding Capability - Interested firms MUST provide a letter or other proof of bonding capacity
.
Notice history
| Notice | Type | Posted |
|---|---|---|
| YOSE 196447 Wawona WWTP | Solicitation | |
| Rehabilitate Wawona Wastewater Treatment Plant, YOSE 196447 | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA | ENDIST Sacramento | No set-aside | |
| LB Lateral Water Line and Facilities Replacement for Wastewater System | — | No set-aside | |
| GRCA 257282 - Replace Wastewater Plant at South Ri | National Office | No set-aside | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside | |
| Coyote Valley Dam (CVD) Lake Mendocino Sewage and Septic Services | ENDIST San Francisco | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity