Refurbish panels/textiles for E-3
Awarded Award Notice Posted
- Solicitation number
- F3YTAJ4121A001
- Agency
- Air Force Sustainment Center Air Force Materiel Command, Department of Defense
- Awarded
- to Michael Johnson
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- FA8101-14-D-0007 Federal IDV award
- NAICS code
- 488190 Other Support Activities for Air Transportation
- PSC
- Not on record
- Place of performance
- Tinker AFB Midwest City, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Aug 27, 2014 4:27 pm
Question:
Will removed components from aircraft by government technicians be placed on pallets and secured or will awardee contractor be responsible for palletization and securing the panels?
Answer:
The contractor will be responsible for securing the panels to and from Tinker AFB.
Update #2 ·
Added: Jul 02, 2014 1:57 pm
Modified: Aug 21, 2014 5:25 pmTrack Changes
1.1.2 Specific Tasks: The contractor shall accomplish the following procedures listed in this PWS in accordance with technical order 1E-3A-2-7. The contractor shall remove old vinyl, hardware, and doors required to accomplish the repair and recovering. The contractor shall repair the panel core, depressions, bumps, cracks, gouges, and dents on edges. The contractor shall ensure the top and bottom of wall panels shall have vinyl rolled over edges and all ceiling panels shall have vinyl rolled on inboard edges. The edges of all panels shall be properly prepared and painted to match the existing color of the panel. The contractor shall use white vinyl.
1.1.3 The contractor shall use consumable materials, adhesives, and potting compounds that are required by T.O. 1E-3A-2-7 specifications. The contractor shall disassemble and reassemble the large storage cabinet 204-1, small storage cabinet 204-2 and the technical order cabinet 204-3, to install vinyl covering on panels, and the new larger cabinet 204-40582-4.
1.1.4 The contractor shall apply vacuum bags over panels in the curing stage at a pressure of 10 to 20 psi and cure for 2-4 hours at 120 degrees for 8-12 hours at room temperature as required by T.O. 1E-3A-2-7 paragraph 8.97.1.
1.1.5 The panels range in size from 4"x 4"doors, 2'x2' doors, 4'x 6' to 2 ½' x 7' panels with an estimated average 4'x4'. The contractor shall remove any seals, hardware, etc., attached to panels to facilitate removal of vinyl. Save all hardware for reinstallation. The contractor shall reinstall any seals, hardware, etc., after installation of new vinyl. The contractor shall repair or replace all loose and broken hardware which remains on and is a permanent part of the panel assembly. All panel grates shall be removed, painted and reinstalled.
Questions asked:
Question 1:
Will the removal of the components be performed by the government or the contractor?
Answer:
The government.
Question 2:
Are the removed components permitted to be taken off site to be refurbished?
Answer:
The refurbishment will take place at the contractor's facility, off of Tinker AFB.
Update #1 ·
Added: Jul 02, 2014 1:57 pm
1.1.2 Specific Tasks: The contractor shall accomplish the following procedures listed in this PWS in accordance with technical order 1E-3A-2-7. The contractor shall remove old vinyl, hardware, and doors required to accomplish the repair and recovering. The contractor shall repair the panel core, depressions, bumps, cracks, gouges, and dents on edges. The contractor shall ensure the top and bottom of wall panels shall have vinyl rolled over edges and all ceiling panels shall have vinyl rolled on inboard edges. The edges of all panels shall be properly prepared and painted to match the existing color of the panel. The contractor shall use white vinyl.
1.1.3 The contractor shall use consumable materials, adhesives, and potting compounds that are required by T.O. 1E-3A-2-7 specifications. The contractor shall disassemble and reassemble the large storage cabinet 204-1, small storage cabinet 204-2 and the technical order cabinet 204-3, to install vinyl covering on panels, and the new larger cabinet 204-40582-4.
1.1.4 The contractor shall apply vacuum bags over panels in the curing stage at a pressure of 10 to 20 psi and cure for 2-4 hours at 120 degrees for 8-12 hours at room temperature as required by T.O. 1E-3A-2-7 paragraph 8.97.1.
1.1.5 The panels range in size from 4"x 4"doors, 2'x2' doors, 4'x 6' to 2 ½' x 7' panels with an estimated average 4'x4'. The contractor shall remove any seals, hardware, etc., attached to panels to facilitate removal of vinyl. Save all hardware for reinstallation. The contractor shall reinstall any seals, hardware, etc., after installation of new vinyl. The contractor shall repair or replace all loose and broken hardware which remains on and is a permanent part of the panel assembly. All panel grates shall be removed, painted and reinstalled.
Attachments
Show all 34
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity