Redesign Repair of Wastewater Treatment Plant

Awarded Limited / Sole Source Justification Posted

Solicitation number
FA4686240014
Agency
Set-aside
No set-aside

Opportunity facts

Contract number
F890321D0034-FA468626FA002
NAICS code
Not on record
Place of performance
Beale AFB, California 95903, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Combat Command issued a Justification and Approval for a non-competitive contract award on February 27, 2026, for design services related to the redesign and repair of the wastewater treatment plant at Beale Air Force Base, California. The contract, valued at $1,683,304.08, was awarded to Raymond Pond Full Services Solutions JV, LLC under the existing AE Next IDIQ contract (Pool 3, Negotiated) to provide architectural and engineering design services for sewage and waste facilities. The scope of work includes a design refresh of select treatment units and structural features to modernize the facility while maintaining operational capabilities during construction, along with additional design services for headworks upgrades, effluent disposal pump replacement, sodium hypochlorite system installation, anaerobic digester demolition, drying bed rehabilitation, paving, roof repair, and generator replacement. The sole source justification was based on Raymond Pond's unique qualifications as the original designer of record with intimate knowledge of the plant and previous design work completed in June 2023, combined with California Professional Engineers Act requirements mandating that a licensed professional engineer personally create or supervise design work. The contract utilizes pre-negotiated hourly rates under the existing IDIQ contract, ensuring fair and reasonable pricing without the need for competitive market research.

Notice text

The scope of work for the wastewater treatment plant includes a design refresh of select treatment units, structural and architectural features to modernize the facility to improve reliability and redundancy. The design shall incorporate a phased construction approach to maintain plant operational capabilities during constrIn addition, the contractor will provide additional design services for upgraded headworks, effluent disposal pump replacement, 12% sodium hypochlorite system, demo anerobic digesters, drying bed rehabilitation, paving, roof repair and generator replacement.

The government total estimated value for the action is $1,683,304.08.

Awarded contract F890321D0034 to unknown vendor for unknown amount on 2026-02-27.

Files

File Type Posted
JA Exception to Fair Opportunity.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors