Recovery--Z--reset barrack buildings 6921 and 6922

Award Notice Posted

Solicitation number
FE10056-9J
Agency
Awarded
to Coleman Construction Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W91248-08-D-0008-0009 Federal contract award
NAICS code
Not on record
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

RESET BARRACK BUILDINGS 6921 AND 6922. This award was a result of a competitive Multiple Award Task Order Contract (MTOC) action. The five (5) MTOC contractors all competed for this award. This is a FIXED PRICE task order.

Update #1 ·

RECOVERY THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER Multiple Task Order Contracts (MTOC), W91248-08-D-0004, W91248-08-D-0005, W91248-08-D-0006, W91248-08-D-0007 and W91248-08-D-0008. The Directorate of Contracting intends to competitively award a firm-fixed price task order utilizing Recovery Act of 2009 funding under MTOC. Please note that only the contractors who have been awarded a Task Order Contract from Fort Campbell, Kentucky, Contracting Office are eligible to prepare and submit a proposal for this solicitation. The anticipated scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary to accomplish the renovation which includes replacing interior & exterior metal doors, new door hardware, door components, doors containing vision panels, door frames, glazing in doors and windows, weather stripping window locks and screens, ceiling tile, fluorescent light fixtures, missing light lens, electric nylon wall plates, exhaust systems, ceiling air diffusers, remote wall mounted thermostat, ceiling occupancy sensors, smoke detectors and alarm, hand rails, metal stair treads, molding, shower light fixture, light bulbs faucets, toilet seats, toilet paper dispensers, glass mirrors, towel bars, sinks, toilet partitions and urinal screens, wooden benches, wall mounted urinals, shower heads, shower mixing valves, main latrines dropped ceiling, and fire protection devices. Other work includes painting; removing all window treatments; repair all walls and ceilings; clean light lens; service central AC system; clean all ceiling diffusers; service all fan coils units; re-attach the wood paneling; install fire extinguishers and storage cabinet; install new emergency egress lighting fixture; repair all drains and 'P' traps; clean and seal around all fixtures, wall and floor grout; install trash receptacle; install wall mounted paper towel dispenser; install new light fixtures; strip and wax with two (2) coats all hardwood and VCT flooring; clean ceramic wall and floor; clean quarry floor tile; dust and wipe down all surfaces; install missing drain piping insulation on fan coil drain line; abate, and lead based paint. To obtain points of contact for subcontracting opportunities, go to DOC website at https://doc.campbell.army.mil and select Active Contracts or email Debra J. Rapp at debra.j.rapp@us.army.mil. Email is the preferred method of contact.

Notice history

Notice Type Posted
RECOVERY--Z--Project Number FE10322-8J, Flagship 159th Admin Facilities 16 Buildings Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors