Recovery--Z--repair the built-up roof and metal roof at bldg 3500, eafb, CA
Award Notice Posted
- Solicitation number
- W912PL-08-D-0021-0003
- Agency
-
ENDIST Los Angeles
US Army Corps of Engineers, Department of Defense
- Awarded
- to Vanguard Construction, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912PL-08-D-0021-0003 Federal contract award
- NAICS code
- 238160 Roofing Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This contract action was accomplished using other than competitive procedures because this is an order under an existing contract that was awarded using non-competitive procedures.
Vanguard Construction, Inc. 1020 E. Grande Ave, Arroyo Grande, CA 93420-2505 This contract action was accomplished by using other than competitive procedures in accordance with FAR 6.302-5(b)(4) for sole source awards under the 8(a) program, 15 U.S.C. 637 and in accordance with FAR 19.805-1(b)(2).Task Order is for a to repair the built-up roof and metal roof at Bldg. 3500 EAFB, CA
Update #1 ·
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912PL-08-D-0021-0003.
Vanguard Construction, Inc., Arroyo Grande, CA. This is not a solicitation. The Los Angeles District, U.S. Army Corps of Engineers has a requirement to repair the built-up roof and metal roof at Bldg. 3500, Edwards AFB, CA. It is the intent of the Government to award a task order on an existing Performance Oriented Construction Activity (POCA). The task order is firm fixed price.
Contractor shall provide all labor, materials, equipment and supervision required to repair the built-up roof and metal roof at Bldg. 3500. Remove unused curbing and install new curbing for HVAC equipment not properly installed. Install metal cross over steps attached to roof deck on built up roof area. Install fully adhered 1/4 inch dens deck and new single ply roof membrane over existing built-up roof system. Replace metal flashings, scuppers, and drip edges. Install walkpads to and around equipment from roof accesses and cross over steps. On metal roof portion install minimum R-30 insulation over existing metal roof and install new pre-finished metal roof with adequate attic ventilation, new pre-finished rain gutters and downspouts. Roof and rain gutters shall be pre-finished colored Redwood. Paint rooftop equipment. Period of Performance- 150 calendar days.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity