RECOVERY--Z--Repair Heating Plant Make Up Air System, Building 227

Award Notice Posted

Solicitation number
W52H09-08-D-5005-9025
Agency
Awarded
to Russell Construction Co Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W52H09-08-D-5005-0022 Federal contract award
NAICS code
236210 Industrial Building Construction
PSC
Not on record
Place of performance
Tacom - Rock Island Attn: Amsta-AQ-AR, Rock Island Arsenal Rock Island IL 61299 US

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

RECOVERY--This amendment changes the project title so it matches the project title on the DoD Recovery Act Project List. The project title is hereby changed to Repair Heating Plant Make Up Air System, Building 227..

Update #5 ·

RECOVERY--This amendment changes the project title so it matches the project title on the DoD Recovery Act Project List. The project title is hereby changed to Repair Heating Plant Make Up Air System, Building 227.

Update #4 ·

RECOVERY The scope of work includes design build and construction services for the removal of the existing make up air units located on the mezzanine in the main boiler room and installation of a properly sized and energy efficient make up air system with building pressurization control. The options referenced in the presolicitation synopsis are not being awarded at this time. This firm fixed price task order was awarded under Contract W52H09-08-D-5005 which was awarded under full and open competition using best value source selection procedures to Russell Construction Co. Inc. of Davenport, Iowa on August 21, 2008. The design build and construction services awarded under this contract include the type of work designated in this synopsis.. Awarded Vendors: Russell Construction Co., Inc., 4600 E. 53rd St., Davenport, IA 52807. Contract Award Dollar Amount: 256520. Contract Award Date: 2009-06-09.

Update #3 ·

RECOVERY The scope of work includes design build and construction services for the removal of the existing make up air units located on the mezzanine in the main boiler room and installation of a properly sized and energy efficient make up air system with building pressurization control. The options referenced in the presolicitation synopsis are not being awarded at this time. This firm fixed price task order was awarded under Contract W52H09-08-D-5005 which was awarded under full and open competition using best value source selection procedures to Russell Construction Co. Inc. of Davenport, Iowa on August 21, 2008. The design build and construction services awarded under this contract include the type of work designated in this synopsis.

Update #2 ·

RECOVERY THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W52H09-08-D-5005. The scope of work requires the removal of the existing make up air units located on the mezzanine in the main boiler room; a comprehensive plan, and providing a properly sized and energy efficient make up air system with building pressurization control. The scope of work includes an option for the isolation of the exhaust in the coal bunker with new doors and closers; boiler plant smoke control and minimizing exhaust fans use in fan room. The scope of work includes another option to dispose of the air handler on the roof of the coal bunker, i.e. relocation, explosion proof duct work, removal, or no change. The scope of work includes another option to separate the make up air system in the ash tunnel. The scope of work includes another option to install controls to prevent the operation of the bunker roof exhaust fan when loading coal and cleaning with compressed air. The scope of work includes another option to extend the combustion air fan inlets upward for boilers 3 and 4 to pick up waste heat in the building. The scope of work includes another option to correct boiler 3 and 4 exhaust hoods, ductwork, fan discharge, and heat problems in the ash tunnel. The estimated price range of this project is between $250,000 and $500,000. The project will be awarded as a firm fixed price task order under contract W52H09-08-D-5005. Contract W52H09-08-D-5005 was awarded under full and open competition with the use of best value source selection procedures to Russell Construction Co. Inc. of Davenport, Iowa on August 21, 2008. The design build and construction services proposed to be awarded under this contract include the type of work designated in this synopsis..

Update #1 ·

RECOVERY THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W52H09-08-D-5005. The scope of work requires the removal of the existing make up air units located on the mezzanine in the main boiler room; a comprehensive plan, and providing a properly sized and energy efficient make up air system with building pressurization control. The scope of work includes an option for the isolation of the exhaust in the coal bunker with new doors and closers; boiler plant smoke control and minimizing exhaust fans use in fan room. The scope of work includes another option to dispose of the air handler on the roof of the coal bunker, i.e. relocation, explosion proof duct work, removal, or no change. The scope of work includes another option to separate the make up air system in the ash tunnel. The scope of work includes another option to install controls to prevent the operation of the bunker roof exhaust fan when loading coal and cleaning with compressed air. The scope of work includes another option to extend the combustion air fan inlets upward for boilers 3 and 4 to pick up waste heat in the building. The scope of work includes another option to correct boiler 3 and 4 exhaust hoods, ductwork, fan discharge, and heat problems in the ash tunnel. The estimated price range of this project is between $250,000 and $500,000. The project will be awarded as a firm fixed price task order under contract W52H09-08-D-5005. Contract W52H09-08-D-5005 was awarded under full and open competition with the use of best value source selection procedures to Russell Construction Co. Inc. of Davenport, Iowa on August 21, 2008. The design build and construction services proposed to be awarded under this contract include the type of work designated in this synopsis.