RECOVERY--Z--PROJECT NUMBER SP00005-6J, Refurbish Finishes, Elect, HVAC Barrack Building 6929, Fort Campbell, Kentucky
Award Notice Posted
- Solicitation number
- SP00005-6J
- Agency
-
MICC Fort Campbell
Mission and Installation Contracting Command, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91248-08-D-0006-0039 Federal contract award
- NAICS code
- Not on record
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This award was a result of a competitive Multiple Award Task Order Contract (MTOC) action. The four (4) MTOC contractors all completed for this award. This is a FIXED PRICE task order. The scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary to accomplish the work which includes replace three (3) boilers and feed water tank and pumps. The new boilers are to be connected to existing component i.e. chemical feed system blowdown, etc. All steam valves are to be replaced from the header to the boiler matching existing type and pressure rating. Welding shall be performed by an AWS certified welder for the type of material and configuration of the material. Replace all weather stripping on all exterior doors on the building.
Update #1 ·
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER Multiple Task Order Contracts (MATOC), W91248-08-D-0004, Linc Government Services, 270-885-4675, W91248-08-D-0005, RCI, Inc, 859-263-2081, W91248-08-D-0006, TMC Contracting, 931-647-2233, W91248-08-D-0007, and Vanguard, 931-431-3771. The Directorate of Contracting intends to competitively award a firm-fixed price task order utilizing Recovery Act of 2009 funding under MATOC. Please note that only the contractors who have been awarded a Task Order Contract from Fort Campbell, Kentucky, Contracting Office are eligible to prepare and submit a proposal for this solicitation. Replace three (3) boilers and feed water tank and pumps. The new boilers are to be connected to existing component i.e. chemical feed system blowdown, etc. All steam valves are to be replaced from the header to the boiler matching existing type and pressure rating. Welding shall be performed by an AWS certified welder for the type of material and configuration of the material. Replace all weather stripping on all exterior doors on the building. Any other questions, please email Debra J. Rapp at debra.j.rapp@us.army.mil. Email is the preferred method of contact.