The scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary to accomplish the renovation which includes ducting and wiping down all surfaces with mild cleaning solution; strip and wax floors; paint ceiling; replace foyer ceiling; asbestos abatement; replace windows; replace window blinds; seal around windows; paint door frames and door; replace damaged doors with metal doors; replace door hardware replace missing door components; replace lock sets; repair door frames; replace un-repairable door frames; replace kick plates; replace exit device with push pad; replace door stops; replace all weather stripping on exterior doors; replace ceiling tile and damaged grid; paint all non-ceiling tile ceilings; replace toilet seats; replace mirrors; replace shower curtains; un-clog latrine fixtures; replace fluorescent light fixtures; replace shower heads; replace wood shower benches with new solid high-density plastic; install new exhaust fans; install fiberglass shower with soap dish; clean air diffusers; install 1/4 inch thick drywall; pressure wash exterior; remove lead based paint from metal surfaces and provide and install a mini split heat pump unit.

Update #2 ·

RECOVERY AWARD NOTICE OF PROJECT. RECOVERYPROJECT NUMBER FE10323-8J, REPAIR 159TH BARRACKS (7110, 7112, 6936), HVAC, PAINT, DOOR/WINDOW, LATRINE. This award was a result of a competitive Multiple Award Task Order Contract (MTOC) action. The five (5) MTOC contractors all completed for this award. This is a FIXED PRICE task order. The scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary to accomplish the renovation which includes replacing missing or damaged interior or exterior hand rails and metal stair treads; replacing interior & exterior metal doors, new door hardware, door components, doors containing vision panels, door frames, glazing in doors and windows, weather stripping window locks and screens, ceiling tile, fluorescent light fixtures, missing light lens, electric nylon wall plates, exhaust systems, ceiling air diffusers, remote wall mounted thermostat, ceiling occupancy sensors, smoke detectors and alarm, hand rails, metal stair treads, molding, shower light fixture, light bulbs faucets, toilet seats, toilet paper dispensers, glass mirrors, towel bars, sinks, toilet partitions and urinal screens, wooden benches, wall mounted urinals, shower heads, shower mixing valves, main latrines dropped ceiling, and fire protection devices. Other work includes painting; removing all window treatments; repair all walls and ceilings; clean light lens; service central AC system; clean all ceiling diffusers; service all fan coils units; re-attach the wood paneling; install fire extinguishers and storage cabinet; install new emergency egress lighting fixture; repair all drains and P traps; clean and seal around all fixtures, wall and floor grout; install trash receptacle; install wall mounted paper towel dispenser; install new light fixtures; strip and wax with two (2) coats all hardwood and VCT flooring; clean ceramic wall and floor; clean quarry floor tile; dust and wipe down all surfaces; install missing drain piping insulation on fan coil drain line; abate, and lead based paint. To obtain points of contact for subcontracting opportunities, go to DOC website at http://doc.campbell.army.mil and select Active Contracts or email Debra J. Rapp at debra.j.rapp@us.army.mil. Email is the preferred method of contact.

Update #1 ·

RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER Multiple Task Order Contracts (MTOC), W91248-08-D-0004, Linc Government Services, 270-885-4675; W91248-08-D-0005, RCI, Inc, 859-263-2081; W91248-08-D-0006, TMS Contracting/Compton Construction, 931-647-2233; W91248-08-D-0007, Vanguard Contractors, 931-431-3771 and W91248-08-D-0008, Coleman Construction, 931-906-9844. The Directorate of Contracting intends to competitively award a firm-fixed price task order utilizing Recovery Act of 2009 funding under MTOC. Please note that only the contractors who have been awarded a Task Order Contract from Fort Campbell, Kentucky, Contracting Office are eligible to prepare and submit a proposal for this solicitation. The anticipated scope of work may include, but is not limited to all labor, supervision, materials and equipment necessary to accomplish the renovation which includes replacing missing or damaged interior or exterior hand rails and metal stair treads; replacing interior & exterior metal doors, new door hardware, door components, doors containing vision panels, door frames, glazing in doors and windows, weather stripping window locks and screens, ceiling tile, fluorescent light fixtures, missing light lens, electric nylon wall plates, exhaust systems, ceiling air diffusers, remote wall mounted thermostat, ceiling occupancy sensors, smoke detectors and alarm, hand rails, metal stair treads, molding, shower light fixture, light bulbs faucets, toilet seats, toilet paper dispensers, glass mirrors, towel bars, sinks, toilet partitions and urinal screens, wooden benches, wall mounted urinals, shower heads, shower mixing valves, main latrines dropped ceiling, and fire protection devices. Other work includes painting; removing all window treatments; repair all walls and ceilings; clean light lens; service central AC system; clean all ceiling diffusers; service all fan coils units; re-attach the wood paneling; install fire extinguishers and storage cabinet; install new emergency egress lighting fixture; repair all drains and P traps; clean and seal around all fixtures, wall and floor grout; install trash receptacle; install wall mounted paper towel dispenser; install new light fixtures; strip and wax with two (2) coats all hardwood and VCT flooring; clean ceramic wall and floor; clean quarry floor tile; dust and wipe down all surfaces; install missing drain piping insulation on fan coil drain line; abate, and lead based paint. To obtain points of contact for subcontracting opportunities, go to DOC website at https://doc.campbell.army.mil and select Active Contracts or email Debra J. Rapp at debra.j.rapp@us.army.mil. Email is the preferred method of contact.