7 versions

Update #7 · Latest ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): HAL HAYS CONSTRUCTION, INC CONTRACT NO W912PL-10-D-0006 - TASK ORDER 0001, MODIFICATION 01

The project consist of the design build for the following Bay Model Building Improvements: Bay Model (BM) roof equipment inventory, The demolition, asbestos abatement, lead abatement, disposal of existing roof coverings, and the design and construction of a new, BM roof covering system. The evaluation of the existing roof drainage systems, and the design and construction of roof drainage system improvements. Maintain as-built drawings during the work, and provide final as-built drawings.

Update #6 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): HAL HAYS CONSTRUCTION, INC. CONTRACT NO W912PL-10-D-0006 - TASK ORDER 0001

The project consist of the design build for the following Bay Model Building Improvements: Bay Model (BM) roof equipment inventory, The demolition, asbestos abatement, lead abatement, disposal of existing roof coverings, and the design and construction of a new, BM roof covering system. The evaluation of the existing roof drainage systems, and the design and construction of roof drainage system improvements. Maintain as-built drawings during the work, and provide final as-built drawings.

Update #5 ·

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): NA

Design-Build for the following Bay Model Building Improvements: Bay Model (BM) roof equipment inventory,The demolition, asbestos abatement, lead abatement, and disposal of existing roof coverings, and the design and construction of a new, BM roof covering system. The evaluation of the existing roof drainage systems, and the design and construction of roof drainage system improvements Maintain as-built drawings during the work, and provide final as-built drawings.

Update #4 ·

The overall contract work shall consist of but not limited to facilities and infrastructures, dormitories, maintenance hangars/AMU, composite repair facilities, unmanned aerial systems, flight simulators, wing headquarters, and other vertical construction

Update #3 ·

The overall contract work shall consist of but not limited to facilities and infrastructures, dormitories, maintenance hangars/AMU, composite repair facilities, unmanned aerial systems, flight simulators, wing headquarters, and other vertical construction

Update #2 ·

The overall contract work shall consist of but not limited to facilities and infrastructures, dormitories, maintenance hangars/AMU, composite repair facilities, unmanned aerial systems, flight simulators, wing headquarters, and other vertical construction

Update #1 ·

The overall contract work shall consist of but not limited to facilities and infrastructures, dormitories, maintenance hangars/AMU, composite repair facilities, unmanned aerial systems, flight simulators, wing headquarters, and other vertical construction

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors