RECOVERY--Z--Project Number 74677, Corporal Gordon M. Craig Army Reserve Center Full Facility Restoration, Brockton, MA
Award Notice Posted
- Solicitation number
- W912QR-09-R-0089
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Awarded
- to Maron Construction Co., Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912QR-10-C-0001 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Restoration of the existing Corporal Gordon M. Craig Army Reserve Center (ARC) in Brockton, Plymouth County, Massachusetts, including the training building with 61,548 square foot (SF), Organizational Maintenance Shop (OMS) with 4,875 SF, and Unheated Storage with 2,735 SF. The training building and OMS will be repaired/restored and brought up to current Army Reserve standards. Repairs will replace floors, ceilings, doors, electrical, mechanical, fire protection, and plumbing systems. A new main entry will be provided on the training building and a new maintenance work bay will be added to the OMS. Supporting facilities will include replacement of utilities serving the project/site, paving of existing parking lots, and fencing.
Update #4 ·
RECOVERY--Restoration of the existing Corporal Gordon M. Craig Army Reserve Center (ARC) in Brockton, Plymouth County, Massachusetts, including the training building with 61,548 square foot (SF), Organizational Maintenance Shop (OMS) with 4,875 SF, and Unheated Storage with 2,735 SF. The training building and OMS will be repaired/restored and brought up to current Army Reserve standards. Repairs will replace floors, ceilings, doors, electrical, mechanical, fire protection, and plumbing systems. A new main entry will be provided on the training building and a new maintenance work bay will be added to the OMS. Supporting facilities will include replacement of utilities serving the project/site, paving of existing parking lots, and fencing.
The estimated cost range for this project is $10M to $25M (closer to $10M).
This is a General Small Business Set-Aside procurement. NAICS code is 236220. Size limitation is $33.5M. The construction contract duration is approximately 490 days.
A site visit is tentatively scheduled for 9:00 AM (EDT) on 26 August 2009 at the Corporal Gordon M. Craig ARC Training Building in Brockton, MA.
This project is a part of the American Recovery and Reinvestment Act (ARRA) of 2009. The following ARRA clauses will be included in the solicitation/contract: FAR 52.225-23, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Buy American Requirements for Construction Material; FAR 52.203-15, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Whistleblower Protections; and FAR 52.204-11, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Reporting Requirements.
The proposals will be evaluated using the Lowest Price Technically Acceptable (LPTA) Source Selection Process with the following rated evaluation criteria: Prime Contra ctor Past Experience, Prime Contractor Past Performance, and Management Plan including schedule. The approximate issue date is 28 July 2009 and approximate closing date is 10 September 2009, 2:00 PM Eastern Daylight Time (EDT). Project documents will be issued via the web only. Downloads are available via the Federal Business Opportunities (FedBizOpps) website http://www.fbo.gov. Amendments will be available only through the FedBizOpps website. This announcement serves as the advance notice for this project.
Update #3 ·
RECOVERY--Restoration of the existing Corporal Gordon M. Craig Army Reserve Center (ARC) in Brockton, Plymouth County, Massachusetts, including the training building with 61,548 square foot (SF), Organizational Maintenance Shop (OMS) with 4,875 SF, and Unheated Storage with 2,735 SF. The training building and OMS will be repaired/restored and brought up to current Army Reserve standards. Repairs will replace floors, ceilings, doors, electrical, mechanical, fire protection, and plumbing systems. A new main entry will be provided on the training building and a new maintenance work bay will be added to the OMS. Supporting facilities will include replacement of utilities serving the project/site, paving of existing parking lots, and fencing.
The estimated cost range for this project is $10M to $25M (closer to $10M).
This is a General Small Business Set-Aside procurement. NAICS code is 236220. Size limitation is $33.5M. The construction contract duration is approximately 490 days.
A site visit is tentatively scheduled for 9:00 AM (EDT) on 26 August 2009 at the Corporal Gordon M. Craig ARC Training Building in Brockton, MA.
This project is a part of the American Recovery and Reinvestment Act (ARRA) of 2009. The following ARRA clauses will be included in the solicitation/contract: FAR 52.225-23, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Buy American Requirements for Construction Material; FAR 52.203-15, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Whistleblower Protections; FAR Subpart 5.7, Publicizing Requirements Under the American Recovery and Reinvestment Act of 2009; and FAR 52.204-11, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Reporting Requirements.
The proposals will be evaluated using the Lowest Price Technically Acceptable (LPTA) Source Selection Process with the following rated evaluation criteria: Prime Contractor Past Experience, Prime Contractor Past Performance, and Management Plan including schedule. The approximate issue date is 28 July 2009 and approximate closing date is 10 September 2009, 2:00 PM Eastern Daylight Time (EDT). Project documents will be issued via the web only. Downloads are available via the Federal Business Opportunities (FedBizOpps) website http://www.fbo.gov. Amendments will be available only through the FedBizOpps website. This announcement serves as the advance notice for this project.
Update #2 ·
RECOVERY--
Restoration of the existing Corporal Gordon M. Craig Army Reserve Center (ARC) in Brockton, Plymouth County, Massachusetts, including the training building with 61,548 square foot (SF), Organizational Maintenance Shop (OMS) with 4,875 SF, and Unheated Storage with 2,735 SF. The training building and OMS will be repaired/restored and brought up to current Army Reserve standards. Repairs will replace floors, ceilings, doors, electrical, mechanical, fire protection, and plumbing systems. A new main entry will be provided on the training building and a new maintenance work bay will be added to the OMS. Supporting facilities will include replacement of utilities serving the project/site, paving of existing parking lots, and fencing.
The estimated cost range for this project is $10M to $25M (closer to $10M).
This is a General Small Business Set-Aside procurement. NAICS code is 236220. Size limitation is $33.5M. The construction contract duration is approximately 490 days.
A site visit is tentatively scheduled for 9:00 AM (EDT) on 26 August 2009 at the Corporal Gordon M. Craig ARC Training Building in Brockton, MA.
This project is a part of the American Recovery and Reinvestment Act (ARRA) of 2009. The following ARRA clauses will be included in the solicitation/contract: FAR 52.225-23, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Buy American Requirements for Construction Material; FAR 52.203-15, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Whistleblower Protections; FAR Subpart 5.7, Publicizing Requirements Under the American Recovery and Reinvestment Act of 2009; and FAR 52.204-11, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Reporting Requirements.
The proposals will be evaluated using the Lowest Price Technically Acceptable (LPTA) Source Selection Process with the following rated evaluation criteria: Prime Contractor Past Experience, Prime Contractor Past Performance, and Management Plan including schedule. The approximate issue date is 28 July 2009 and approximate closing date is 10 September 2009, 2:00 PM Eastern Daylight Time (EDT). Project documents will be issued via the web only. Downloads are available via the Federal Business Opportunities (FedBizOpps) website http://www.fbo.gov. Amendments will be available only through the FedBizOpps website. This announcement serves as the advance notice for this project.
Update #1 ·
RECOVERY--
Restoration of the existing Corporal Gordon M. Craig Army Reserve Center (ARC) in Brockton, Plymouth County, Massachusetts, including the training building with 61,548 square foot (SF), Organizational Maintenance Shop (OMS) with 4,875 SF, and Unheated Storage with 2,735 SF. The training building and OMS will be repaired/restored and brought up to current Army Reserve standards. Repairs will replace floors, ceilings, doors, electrical, mechanical, fire protection, and plumbing systems. A new main entry will be provided on the training building and a new maintenance work bay will be added to the OMS. Supporting facilities will include replacement of utilities serving the project/site, paving of existing parking lots, and fencing.
The estimated cost range for this project is $10M to $25M (closer to $10M).
This is a General Small Business Set-Aside procurement. NAICS code is 236220. Size limitation is $33.5M. The construction contract duration is approximately 490 days.
A site visit is tentatively scheduled for 9:00 AM (EDT) on 12 August 2009 at the Corporal Gordon M. Craig ARC Training Building in Brockton, MA.
This project is a part of the American Recovery and Reinvestment Act (ARRA) of 2009. The following ARRA clauses will be included in the solicitation/contract: FAR 52.225-23, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Buy American Requirements for Construction Material; FAR 52.203-15, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Whistleblower Protections; FAR Subpart 5.7, Publicizing Requirements Under the American Recovery and Reinvestment Act of 2009; and FAR 52.204-11, American Recovery and Reinvestment Act of 2009 (the Recovery Act) -- Reporting Requirements.
The proposals will be evaluated using the Lowest Price Technically Acceptable (LPTA) Source Selection Process with the following rated evaluation criteria: Prime Contractor Past Experience, Prime Contractor Past Performance, and Management Plan including schedule. The approximate issue date is 28 July 2009 and approximate closing date is 2 September 2009, 2:00 PM Eastern Daylight Time (EDT). Project documents will be issued via the web only. Downloads are available via the Federal Business Opportunities (FedBizOpps) website http://www.fbo.gov. Amendments will be available only through the FedBizOpps website. This announcement serves as the advance notice for this project.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity