Recovery--Z--project number 330610, timberline water system improvements
Award Notice Posted
- Solicitation number
- W9127N-10-R-0045
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Awarded
- to Just Bucket Excavating, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9127N-10-C-0044 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Contract Award Amount equals $479,464.23 Recovery Funds, and $193,961.59 Non-Recovery Funds.
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award.
The Timberline Lodge pump house has been in service for 50 years housing and protecting all pumping equipment that serves the Lodge and Ski Facilities. Due to the aging that comes from surviving 50 Mt. Hood winters the structural framing is now in need of upgrades and improvements. Remedial upgrades and improvements can extend the useful service life of this facility for many decades to come. Proposed actions are to re move and replace all existing concrete foundations and reconnect 4x12 frame to new concrete and upgrade the connection between 4x12 frame members and 2x12 crossties with new hardware, fasteners, and resoration of all 4x12s and 2x12s to original strength and condition.
Update #1 ·
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS ONLY AVAILABLE TO CONTRACTOR UNDER W9127N-10-R-0045. THIS IS A UNITED STATES FOREST SERVICE REQUIREMENT BEING SUPPORTED BY THE US ARMY CORPS OF ENGINEERS - PORTLAND DISTRICT. THIS OPPORTUNITY IS AVAILABLE ONLY TO 8A CONTRACTOR: Just Bucket Excavating Inc. (DUNS: 791892651). This contract action will be accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires it, (FAR 6.302-5) sole source awards under the 8a program. The Timberline Lodge pump house has been in service for 50 years housing and protecting all pumping equipment that serves the Lodge and Ski Facilities. Due to the aging that comes from surviving 50 Mt. Hood winters the structural framing is now in need of upgrades and improvements. Remedial upgrades and improvements can extend the useful service life of this facility for many decades to come. Proposed actions are to remove and replace all existing concrete foundations and reconnect 4x12 frame to new concrete and upgrade the connection between 4x12 frame members and 2x12 crossties with new hardware, fasteners, and resoration of all 4x12s and 2x12s to original strength and condition. Magnitude of construction is $500,000.00 to $1,000,000.00.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity