RECOVERY--Z--PROJECT NUMBER 2730, Carters Dam and Lake, GA Task Order for RECOVERY-Powerhouse Roof Repair Carters Lake Project, Georgia.
Award Notice Posted
- Solicitation number
- W91278-10-221-ARRA
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Awarded
- to Meco Builders Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91278-10-D-0029-0007 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
RECOVERY - - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER: W91278-10-D-0029 Task Order Notification. The Mobile District Corps of Engineers has awarded a Firm Fixed Price Task Order (0007) against contract number W91278-10-D-0029 an IDIQ contract which was fully competed and established in accordance with FAR Part 15, on 19-Nov-2009. This contract is for the Various Horizontal and minor vertical Construction Projects within Allatoona Lake, Buford Dam, Lake Sidney Lanier, Carters Dam and Lake, and West point Dam and Lake, Georgia and Alabama. This contract was awarded to MECO Builders, Inc, 42 Northpark Drive, Chatsworth, GA 30705. Recovery Act approved Project for the Powerhouse Roof Repair, Carters lake Project, Georgia. POC: Donna Parker, Contracting Officer Mobile District, US Army Corps of Engineers, P.O. Box 2288, Mobile, AL 36628-0001.
Update #1 ·
RECOVERY--PER FAR 5.7, THIS NOTICE IF PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTORS UNDER THE CURRENT CONTRACT NUMBERS: W91278-10-D-0028 & W91278-10-R-0029; These contracts were awarded to BARLOVENTO, L.L.C., 431 TECHNOLOGY DR, DOTHAN AL 36303-1039; and MECO BUILDERS, INC., 20 JACKSON LAKE RD, CHATSWORTH GA 30705-5145. IDIQ contracts which were fully completed and established in accordance with FAR Part 15, on 19-Nov-2009. These contracts are for Various Horizontal and Minor Vertical Construction projects in Georgia and Alabama. The U.S. Army Corps of Engineers plans to award a Task Order for construction of the replacement of the existing roofs at the Powerhouse at Carters Dam Project, GA, according to the attached plans and specifications. The Powerhouse Building is approximately 360 feet
by 70 feet and the Control Building is approximately 28 feet by 62 feet. The existing roofing material will be removed and replaced with new, energy efficient roofing materials as shown in the plans and specifications. All appurtenant features on the roofs shall be protected or removed, stored and replaced once the new roof is in place. Rooftop exhaust fans will need to remain operation during the
construction period. POC: Donna Parker, Contracting Officer Mobile District, US Army Corps of Engineers, P.O. Box 2288, Mobile, AL 36628-0001. 251-441-6501