RECOVERY--Z--PROJECT NUMBER 2520, Canaveral Harbor, FL CANAVERAL HARBOR, FL, SAND BYPASS, PERIODIC SAND BYPASSING CONTRACT, PHASE IV, BREVARD COUNTY, FLORIDA
Award Notice Posted
- Solicitation number
- W912EP09B0027
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Awarded
- to Great Lakes Dredge & Dock Co, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912EP-10-C-0008 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
The work includes sand bypassing from the beach north of the Canaveral Harbor inlet to the beach south of the Canaveral Harbor inlet. The Sand Bypass Borrow Area (SBBA) is defined as the area between the mean high water line and the -19.3 ft NAVD 88 contour, and between the north jetty of the Canaveral Harbor navigation channel and a parallel line 8,300 feet north. The Southern Beach/placement area is 12,560 ft beginning at Monument R-1T and continuing to monument R-14, and landward elevation of approximately +7.2 ft NAVD 88, sloping gradually to a seaward crest elevation of approximately +6.2 ft NAVD 88, with seaward slope of approximately 1:25 to the intersection with the existing seabed. In order to facilitate the bypass the Contractor shall dig a trench across Cut 2 of the Canaveral Harbor Entrance Channel. This trench must be deep enough in order to have 3 feet of cover over the pipeline while not impeding on the required depth of the channel. The contract includes a base and three options founded on production excavation quantity and funding. The estimated quantities are 485,000 cubic yards for the Base, 65,000 cubic yards for Option A, 50,000 cubic yards for Option B, and 30,000 cubic yards for Option C. The order of placement for the base and all options shall be from south to north. This work also includes beach tilling, turbidity monitoring, vibration control monitoring, and endangered species monitoring.
Update #2 ·
RECOVERY--The work includes sand bypassing from the beach north of the Canaveral Harbor inlet to the beach south of the Canaveral Harbor inlet. The Sand Bypass Borrow Area (SBBA) is defined as the area between the mean high water line and the -19.3 ft NAVD 88 contour, and between the north jetty of the Canaveral Harbor navigation channel and a parallel line 8,300 feet north. The Southern Beach/placement area is 12,560 ft beginning at Monument R-1T and continuing to monument R-14, and landward elevation of approximately +7.2 ft NAVD 88, sloping gradually to a seaward crest elevation of approximately +6.2 ft NAVD 88, with seaward slope of approximately 1:25 to the intersection with the existing seabed. In order to facilitate the bypass the Contractor shall dig a trench across Cut 2 of the Canaveral Harbor Entrance Channel. This pipeline shall be anchored and remain below the project channel depth of 44 feet until completion of work. The contract includes a base and three options founded on production excavation quantity and funding. The estimated quantities are 485,000 cubic yards for the Base, 65,000 cubic yards for Option A, 50,000 cubic yards for Option B, and 30,000 cubic yards for Option C. The order of placement for the base and all options shall be from south to north. This work also includes beach tilling, turbidity monitoring, vibration control monitoring, and endangered species monitoring.
Magnitude of construction is between $5,000,000.00 and $10,000,000.00. This solicitation will be issued on or about 28 September 2009 and open on or about 3 November 2009. THIS IS AN UNRESTRICTED ACQUISITION. There will be a price preference for certified HUBZone small business concerns that comply with the requirements in the solicitation as stipulated in FAR 19.1307. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call 1-888-227-2423 for more information or visit the CCR website at http://www.ccr.gov. You also must be registered in Online Representations and Certifications Application (ORCA) in order to receive an award from this solicitation. The ORCA website is located at http://orca.bpn.gov. NAICS Code 237990, size standard $20 million.
Update #1 ·
RECOVERY--The work includes sand bypassing from the beach north of the Canaveral Harbor inlet to the beach south of the Canaveral Harbor inlet. The Sand Bypass Borrow Area (SBBA) is defined as the area between the mean high water line and the -19.3 ft NAVD 88 contour, and between the north jetty of the Canaveral Harbor navigation channel and a parallel line 8,300 feet north. The Southern Beach/placement area is 12,560 ft beginning at Monument R-1T and continuing to monument R-14, and landward elevation of approximately +7.2 ft NAVD 88, sloping gradually to a seaward crest elevation of approximately +6.2 ft NAVD 88, with seaward slope of approximately 1:25 to the intersection with the existing seabed. In order to facilitate the bypass the Contractor shall dig a trench across Cut 2 of the Canaveral Harbor Entrance Channel. This trench must be deep enough in order to have 3 feet of cover over the pipeline while not impeding on the required depth of the channel. The contract includes a base and three options founded on production excavation quantity and funding. The estimated quantities are 485,000 cubic yards for the Base, 65,000 cubic yards for Option A, 50,000 cubic yards for Option B, and 30,000 cubic yards for Option C. The order of placement for the base and all options shall be from south to north. This work also includes beach tilling, turbidity monitoring, vibration control monitoring, and endangered species monitoring.
Magnitude of construction is between $10,000,000.00 and $25,000,000.00. This solicitation will be issued on or about 28 September 2009 and open on or about 3 November 2009. THIS IS AN UNRESTRICTED ACQUISITION. There will be a price preference for certified HUBZone small business concerns that comply with the requirements in the solicitation as stipulated in FAR 19.1307. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call 1-888-227-2423 for more information or visit the CCR website at http://www.ccr.gov. You also must be registered in Online Representations and Certifications Application (ORCA) in order to receive an award from this solicitation. The ORCA website is located at http://orca.bpn.gov. NAICS Code 237990, size standard $20 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER 2520, Canaveral Harbor, FL | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity