RECOVERY--Z--PROJECT NUMBER 22371, Rpr Components of Electrical Substation - Bd 1888 (DPW), PROJECT NUMBER 22554, Repair/Replace Components Feeders 6&7 (DPW), PROJECT NUMBER 25545, Install Solar Heating Systems For Billeting, PROJECT (See Desc)
Award Notice Posted
- Solicitation number
- W9126G-06-R-0041
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9126G-06-D-0043, Task Order DS02, DS0201
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
(Subject Continued) NUMBER 30180, Replace 2 Each Back-Up Generators, Electrical Distribution System (DPW)
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to The Ross Group Construction Corp., to perform the following work: Provide for remote monitoring (in B1950) of all generators installed as part of this project. Implied tasks to include (but not limited to): (1) Networthiness and DICAP accreditation (assistance to be provided through DPW Energy Office). (2) Acquisition of a medium grade server (capable of handling approximately 20 generator sets). (3) Acquisition of frontend software. (4) Additional programming time for newly acquired frontend software. (5) Additional Point Verification Testing. (6) Frontend customization of graphics associated with this modification.
Update #3 ·
(Subject Continued) NUMBER 30180, Replace 2 Each Back-Up Generators, Electrical Distribution System (DPW)
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to The Ross Group Construction Corp., to perform the following work: Provide a credit to delete from the project the replacement of approximatley 39 poles in the 4400 Area. The poles run along Thomas Street, Blair Street, and the North Side of Mow-Way. Provide a credit to delete pole 6-5 from the project as it as already been replaced.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
As part of Operation and Maintenance, Army, Recovery Act, this modification has been issued to The Ross Group Construction Corp., to perform the following work: Based on a DPW asbestos survey from 1991, the floor tile and/or mastic under the resilient flooring is Asbestos Containing Material (ACM) which exceeds threshold limits requiring abatement procedures. The awarded contract Option 2, amended Appendix G, includes replacement of floor tile through this area. Total floor area is approx. 7,500 SF. This BCD replaces TE001. Additional flooring shown in Amendment 007 was removed from scope of work.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
Asd part of the Operations and Maintenance, Army, Recovery Act, this modification has been issued to The Ross Group Construction Corp., to perform the following work: (1) Delete fire alarm, mass notification system including HVAC shut-off, Knox box work. Design, submittals, O&M manuals not required. (2) Delete replacement of all fire alarm signal and initiating devices. Design, submittals, O&M documents not required. Mass notification system is still required. (3) Delete Fire Alarm work, except for the installation of one pull station on the south exit door where none exist. Mass notifications system is still required.
Notice history
4 of 5 notices listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity