RECOVERY--Z--PROJECT NUMBER 20120, Wister Lake, OK, PROJECT NUMBER 5650, Eufaula Lake, OK, PROJECT NUMBER 8790, Kaw Lake, OK
Award Notice Posted
- Solicitation number
- W912BV-09-R-1008
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV-09-D-1004, Task Order 0004, 000403
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Usace District, Tulsa Attn: Ceswt-CT, 1645 South 101st East Avenue Tulsa OK 74128 US
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Silver Spur Construction Co., W912BV-09-D-1002, Task Order 0004
As part of Operations and Maintenance, Army, Recovery Act, the contract number was shown as W912BV-09-D-1004, Task Order 0004 and should have been contract number W912BV-09-D-1002, Task Order 0004.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Multiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Silver Spur Construction, Co., to perform the following work: The contractor shall supply and install an additional 500 SY of Armorflex concrete block, or equal, at Campsite #34MII36 according to the direction of the Contracting Officer's Representative, and in accordance with the manufacturer's standard detail and specifications.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Multiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Silver Spur Construction, Co., to extend the contract as follows: This modification is issued to extend the contract completion date 52 calendar days for all work under this task order as the result of delays caused by high water levels at Kaw, Eufaula, Wister, and Ft. Gibson Lakes and inclement weather as described in the Default Section of the contract, 52.249-10. These delays occurred during the period between 23 April 2010 and 31 August 2010. These delays were not due to any fault or negligence on the part of the Contractor.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER 74945, Lake Texoma, Denison Dam, TX | Award Notice | |
| This notice | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 1450, Pearson - Skubitz Big Hill Lake, KS | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 13370, Optima Lake, OK | Award Notice |
4 of 8 notices listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity