RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK
Award Notice Posted
- Solicitation number
- W912BV-09-R-1010
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV-09-D-1013, TO 0003, 000303
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
16 versions
Update #16 · Latest ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modifications has been issued to Ken Laster Co., to perform the following work: 1. Reaccomplish dewatering effort of the conduit and stilling basin. Power wash with potable water the entire surface area of the conduit due to water release to prepare for installation of the bonding bridge and mortar. 2. Relocate Electrical Panel in Gate Tower for tension bar alignment and modify Tension Bar plates for 1-inch anchor bolts.
Update #15 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Alltech Engineering, to perform the following work: (1) This change funds the revision of the gate steel from A36 to A50 to meet design requirements. (2) Add shop drawings to the work being done to replace the draft tube gates.
Update #14 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: POCA
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Ken Laster, Co., to delete the following work: Delete the requirement in Line Item 10 to Rehabilitate the two Lower Blocks. This is a credit modification in the amount of $36,000.00 decrease.
Update #13 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Hartman Walsh Painting Company, to perform the following work: Repair Cracked Weld on Tainter Gate No. 6--1.1 Provide labor, materials and equipment to repair the cracked weld identified on the gusset plate attached to the west trunnion arm cross brace on tainter gate No. 6. Work includes: Provide labor, material and equipment to remove the attached gussett plate and remove all rust by grinding or mechanically cleaning and check condition of the braces. After cleaning and removal of all pack rust is completed make the necessary preparations to re-weld in the same location a new 1/2-inch thick A36 steel gusset plate with the same type of weld as previously used. The final step will be to seal all sides and of the plate with a single pass weld on all open edges. 1.2 All steel repairs shall follow specification 05 05 50 of the original contract. All welds, procedures, qualifications, personnel etc., shall conform to the original construction specifications section 05 05 50 and as directed from the USACE Tulsa District EC-DC. All replaced steel components shall be properly prepared and painted per specification 099702 section.
Update #12 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Alltech Engineering, to perform the following work: The contractor shall update fabrication drawings and construct six (6) new draft tube gates in accordance with all applicable codes and regulations. Reduce the quantitites for structural and weldd repair by removing all unused quantities for the draft tub gates and intake bulkheads. Also, remove amounts of weld repair alloted to the intake power gates that is not required to repair those gates.
Update #11 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to McCormick Painting Company, to perform the following work: Additional ultrasonic inspection of the weld on the critical splice joints onthe bottom of the main gorders of 8 bridge spans.
Update #10 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Alltech Engineering, to perform the following work: The contractor shall update fabrication drawings and construct six (6) new draft tube gates in accordance with all applicable codes and regulations. Reduce the quantities for structural and weld repair by removing all unused quantities for the draft tube gates and intake bulkheads. Also, remove amounts of weld repair alotted to the intake power gates that is not required to repair those gates.
Update #9 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Hartman Walsh Painting Company, to perform the following work: Replace the additinal side seal spacer bars located on several tainter gates. These additional bars are not shown on the as-built drawings and all spacer bars are being eplaced per the scope of work.
Update #8 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Hartman Walsh Painting Company, to perform the following work: 1.1 Provide labor, materials and equipment to repair the cracked weld identified on the vertical strut and skin plate on tainter gate #2. Work includes: removing the existing paint around the cracked weld, grind/remove the full length (plus 1-inch) and depth of the cracked weld down to original steel, reweld the strut and skin plate connection with a 1/4-inch fillet weld. In the event that a gap is present insert a shim between the strut and skin plate and use either a larger fillet weld or step down with 2 fillet welds. 1.2 All steel repairs shall follow specification 05 05 50 of the original conract. All welds, procedures, qualifications, personnel etc., shall conform to the original construction specifications section 05 05 50 and as directed by the USACE Tulsa District EC-DC office. A certified welder/fabrication shop shall perform all welding and a certified welding inspector (C.W.I.) shall inspect all repair work; refer to specification 05055. All replaced steel components shall be properly prepared and painted per specification 099702 section 3.1.2. Paint system shall be system 5-E-Z. 1.3 Upon completion of the weld repairs the contractor shall prep and paint the heat damaged gate surfaces with the 5-E-Z paint system, on both the upstream and downstream sections of the tainter gate.
Update #7 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: POCA
As part of Operations and Maintenance, Army, Recovery Act, this modifications has been issued to Ken Laster Co., to perform the following work: Perform mortar repairs to the inner surface area at the gate tower and transition as shown on the revised drawings.
Update #6 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: POCA
As part of Operations and Maintenance Army, Recovery Act, this modification is issued to Ken Laster Co., to perform the following work: Repair the small bulkhead by replacing the channge on one side. On large bulkhead straighten the lifting hook, lifting beam, and straighten water cap. Disassemble and refurbish seized lifting beam arms on large bulkhead, replace bolts and pins on hooks, and inspect all the welds on the bulkheads. Remove rock in stoop area and pathway to discharge conduit and place a concrete stoop at the bottom of the conduit access stairs.
Update #5 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC
As part of Operations and Maintenance Army, Recovery Act, this modification is issued to Hartman Walsh Painting Company to perform the following work: Provide additional ultrasound testing for remaning 95 percent of the tainter gate chain links not covered in the contract. Five percent of links were UT tested as part of the original contract.
Update #4 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): W912BV-09-D-1010; W912BV-09-D-1011; W912BV-09-D-1012; W912BV-09-D-1013; W912BV-09-D-1014.
Multiple Award Task Order Contract (MATOC) for Preparation and Painting of Large Industrial and Hydraulic Stationary and Floating Structures Within Southwestern Division Boundaries.
Update #3 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Ken Laster Company/Timco Blasting & Coatings, Inc., W912BV-09-D-1013, TO 0003, MATOC
As part of Operations and Maintenance, Army, Recovery Act, modification has been issued to Ken Laster Company/Timco Blasting & Coatings, Inc., to perform the following work: Repair the service bridge corbels by drilling 16 holes through the existing corbel and tower wall and installing 16 tension bars with anchor plates.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Ken Laster Company, W912BV-09-D-1013, TO 0003, MATOC
As part of Operations and Maintenance, Army, Recovery Act, modification has been issued to Ken Laster Company, to perform the following Government exercised Option 2 as follows: Repair of Discharge Conduit at Pine Creek Lake.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: McCormick Painting Company, W912BV-09-D-1012, TO 0002, MATOC
As part of Operations and Maintenance, Army, Recovery Act, modification has been issued to McCormick Painting Company, to perform the following work associated with the Government exercising Options 2 through 9 as follows: Inspect All Welds, Span 6, Eufaula; Fillet Weld Repair, Span 6, Eufaula; Paint Bridge, Span 6, Eufaula; Inspect All Welds, Span 7, Eufaula; Fillet Weld Repair, Span 7, Eufaula; Paint Bridge, Span 7, Eufaula; Inspect All Welds, Span 8, Eufaula; Fillet Weld Repair, Span 8, Eufaula, Paint Bridge, Span 8, Eufaula; Inspect All Welds, Span 9, Eufaula; Fillet Weld Repair, Span 9, Eufaula; Paint Bridge, Span 9, Eufaula; Inspect all Welds, Span 10, Eufaula; Fillet Weld Repair, Span 10, Eufaula; Paint Bridge, Span 10, Eufaula; Inspect All Welds, Span 11, Eufaula; Fillet Weld Repair; Span 11, Eufaula; Paint Bridge, Span 11, Eufaula; Commercial Blast and Paint Hoist Operating Equipment, Newt Graham L&D 18; and Commercial Blast and Paint Hoist Operating Equipment Platforms and Decking (Top and Bottom), Newt Graham L&D 18.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 18350, Toronto Lake, KS | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK | Award Notice | |
| This notice | Award Notice |
4 of 11 notices listed here. See the rest on GovTribe.