RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK, PROJECT NUMBER 18350, Toronto Lake, KS, PROJECT NUMBER 5790, Fall River Lake, KS, PROJECT NUMBER 6000, Fort Gibson Lake, OK, PROJECT NUMBER 7850, Hulah Lake, OK, PROJECT NUMBER (See Desc)
Award Notice Posted
- Solicitation number
- W9126G-08-R-0171
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W9126G-08-D-0083, DS01, DS0102
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
(Subject Continued) 8790, Kaw Lake, OK
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Overland Corporation, to perform the following work--Additional Guardrail Installation: Fall River--Remove and replace 370 LF of guardrail at the power house road. Remove and do not replace 790 LF of unwarranted damaged guardrail on the roadway approach to the main embankment. Toronto--Remove and replace 225 LF of guardrail at the power house road. Replace the deleted parapet walls with two turned down rail connections. Tenkiller--Remove and replace 400 LF of guardrail at the power house parking lot. Ft Gibson: Remove and replace 450 LF of guardrail at the power house road. Hula--Replace one parapet wall with tapered flat work to prevent blunt end collisions. Revise one parapet wall by removal of the imbedded light fixure in the existing parapet wall, breaking back the existing parapet wall to allow epoxy coated rebar to be doweled in and encased in new structural concrete flush with the roadway surface of the existing parapet wall.
Kaw--Install new Tribeam connections in lieu of the two parapet walls by coring the existing parapet wall for tiebeam connections.
Update #2 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
As part of the Operations and Maintenance, Army, Recovery Act, the previous award notice is hereby amended to reflect the correct award of Modification DS0102, which should have read November 8, 2010.
Update #1 ·
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: Mutiple Award Task Order Contract (MATOC)
As part of Operations and Maintenance, Army, Recovery Act, this modifications has been issued to Overland Corporation, to perform the following work: STRUCTURAL CONCRETE REVISIONS: Kaw--Delete two parapet walls. Toronto--Delete two parapet walls.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER 2040, Broken Bow Lake, OK, PROJECT NUMBER 2570, Canton Lake, OK | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 5790, Fall River Lake, KS, PROJECT NUMBER 7850, Hulah Lake, OK, PROJECT NUMBER 8790, Kaw Lake, OK, PROJECT NUMBER 8990, Keystone Lake, OK | Award Notice | |
| This notice | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 10650, Marion Lake, KS | Award Notice |
4 of 12 notices listed here. See the rest on GovTribe.