RECOVERY--Z--Project Number 111134, Wood River Drainage and Levee District - Closure Structures Rehabilitation, Mississippi River, Madison County, Illinois
Award Notice Posted
- Solicitation number
- W912P910R0740
- Agency
-
ENDIST St Louis
US Army Corps of Engineers, Department of Defense
- Awarded
- to BCI Construction Usa, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912P910D0530 Federal IDV award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- More information
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Contract Award Amount equals $742,263.66 Recovery Funds, and $399,680.44 Non-Recovery Funds.
Work consists of modification, reconstruction and repair of 22 closure structures. Three closure structures will be permanently closed by filling the opening with soil. Swing gates will be replaced at two sites and reconstructed at 13 sites. Gate reconstruction includes repair of steel and new paint and seals. Concrete sills at four sites will be repaired. Concrete abutments will be replaced at 2 sites and repaired at one site. Additional work includes sealing concrete at one location and resealing all expansions joints.
Update #3 ·
Contract Award Amount equals $1,433,199.30 Recovery Funds, and $771,722.70 Non-Recovery Funds.
Work consists of modification, reconstruction and repair of 22 closure structures. Three closure structures will be permanently closed by filling the opening with soil. Swing gates will be replaced at two sites and reconstructed at 13 sites. Gate reconstruction includes repair of steel and new paint and seals. Concrete sills at four sites will be repaired. Concrete abutments will be replaced at 2 sites and repaired at one site. Additional work includes sealing concrete at one location and resealing all expansions joints. Full award amount is NTE $2,204,922.00. Funds will be obligated on Task Orders.
Update #2 ·
This is a 100% Small Business set-aside. Work consists of modification, reconstruction and repair of 22 closure structures. Three closure structures will be permanently closed by filling the opening with soil. Swing gates will be replaced at two sites and reconstructed at 13 sites. Gate reconstruction includes repair of steel and new paint and seals. Concrete sills at four sites will be repaired. Concrete abutments will be replaced at 2 sites and repaired at one site. Additional work includes sealing concrete at one location and resealing all expansions joints. Solicitation will be issued on or about June 20, 2010.
Update #1 ·
This opportunity is available to SBA Certified 8A Program Participants. Work consists of modification, reconstruction and repair of 22 closure structures. Three closure structures will be permanently closed by filling the opening with soil. Swing gates will be replaced at two sites and reconstructed at 13 sites. Gate reconstruction includes repair of steel and new paint and seals. Concrete sills at four sites will be repaired. Concrete abutments will be replaced at 2 sites and repaired at one site. Additional work includes sealing concrete at one location and resealing all expansions joints.