Recovery--Z--change order - 0001CHETHAM power plant intake gate repair / refurbishing

Award Notice Posted

Solicitation number
W912P5-09-T-0013
Agency
Awarded
to Renewable Resources & Management, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W912P5-09-P-0184 P00001 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

In Scope Change Order for Repair and Refurbish of Cheatham Dam Intake Gates.
The work shall consist of performing surface preparation on the lower third portion of gate one. The bottom third of gate one was responding differently to surface preparation and needed to be evaluated for a possible deviation to the original contract specifications. When blisters present on the surface of the gate were ruptured, the blisters revealed a black coating on the surface of the gate and the backside of the removed paint film. Further examination of the removed film confirmed the black coating not to be mil scale but an unknown coating releasing from the gate causing blisters on just the bottom portion of gate one. The Contractor shall use agents of a caustic blend to remove the existing paint. The Contractor shall remove 100% of the existing coating system from that third of gate one. The Contractor shall get approval from the Contracting Officer's representative that the existing paint surface has been thoroughly removed prior to applying any new paint.

Notice history

Notice Type Posted
This notice Latest Award Notice
RECOVERY--Z--Cheatham Intake Gate Repair and Refurbish Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors